John Appleby FCA 82 Upper Hanover Street Sheffield S3 7RQ
Internal/external alterations to offices to create1no. dwellinghouse including removal of upvc windows and replacement with timber sliding sashes and installation of conservation rooflights
Bond Bryan Architects Church Studio 400 Springvale Road Sheffield S10 1LP
Internal alterations to include formation of offices, meeting rooms , reconfiguration of WCs, relocation of reading pulpit, new louvered door, louvered opening to dormer window (Amended description)
Wellhouse Farm 223 Oldfield Road Sheffield S6 6DZ
Internal and external alterations to dwellinghouse. External alterations include: removal of 2 timber sheds, summerhouse, stone bench and garden stone wall. Erection of a timber-clad studio for use as ancillary office, bike and garden store, provision of landscaping thereto including a telescope stand and one mounted CCTV camera. Provision of one free-standing CCTV camera. Erection of a timber fence to the western boundary of the site over existing stone wall to a maximum height of 1.5 metres. Provision of hard landscaping to provide parking space to the northern boundary of the site, installation of a free-standing electric vehicle charger and erection of a metal fence and gate. Replacement of doors and windows including removal of non-original dormer windows and oriel window and installation of roof lights and replacement roof tiles Internal alterations include: finishes to refurbished roof including insulation; glazed screen to entrance lobby removed; removal of non-original finish from beams in living room; exposure of original stone to stairway; refurbishment of staircase; provision of ground floor WC; provision of ensuite to bedroom and removal of gypsum plaster within the living room and replacement with lime plaster
University Of Sheffield Firth Court Western Bank Sheffield S10 2TN
Internal alterations and refurbishment of existing office accommodation on Floor B, Firth Court to form a laboratory space, including internally blocking up of 3 windows facing the internal service yard and applying a white matte light blocking film