Shepherds Arms Cluntergate Horbury Wakefield WF4 5DA
Removal of existing shelter and decking at the front and creation of outdoor Astro-turf area with picket fencing, posts and festoon lighting. Construction of timber arbour to main entrance and lean-to shelter and external storage area to side. Construction of 1.8m fencing to side and new hardstanding areas to front and side. Replacement of windows at front with double doors. Internal decoration.
Kirkthorpe Weir Kirkthorpe Wakefield
Construction of a fence to prevent unauthorised access
Calder & Hebble Navigation Hall Lane Thornhill Dewsbury WF12 0QL
Phase 2 of works; recovery of masonry and setts from original structure and reuse during works (where viable), management of water flows during works, construction of concrete backing to lock wall including base slab, reconstruction and repointing of collapsed lock bullnose, construction of new lock bywash channel, reinstatement of lock island including lock quadrants, bywash handrail, topsoil and seeding, removal of dam between two locks, removal of access ramp and flume pipes and reinstatement of bank, excavate flood deposits downstream and pull to the bottom of offside bank and reopening of palisade fence and gates across towpath for access