11 Hill Street London W1J 5LF
Alterations to the existing building including new partitions within the ground and second floor, refurbishment of the internal finishes within first floor, repair of selected windows at first and fourth floors, and installation of new plant at roof level. (Linked with 23/05691/FULL)
30B Wimpole Street London W1G 8YB
Installation of four air conditioning units within an acoustic enclosure at roof level including secondary glazing windows throughout; Internal and external alterations and refurbishment; Other associated works. (Linked with 23/06813/FULL)
Flat 8 91 Westbourne Terrace London W2 6QT
Demolition of the existing mansard roof to the rear of the property, reconstruction of a new mansard roof and formation of a terrace, internal alterations and internal refurbishment works, and replacement of windows to the front and rear elevation [Linked to 23/06504/NMA]
St Barnabas C Of E School St Barnabas Street London SW1W 8PF
Installation of air source heat pumps on first floor level flat roof within enclosure and associated alterations to heating system. Internal alterations, including to partitions.
27 Gloucester Place London W1U 8HU
Alterations at lower ground floor level including extension within front lightwell, replacement of flat roof to rear and creation of terrace, and internal alterations.
62 Clifton Hill London NW8 0JT
Erection of roof extensions, a side extension at lower-ground floor level, minor internal and external works, alterations to the boundary treatment and landscaping scheme.
7 St James's Square London SW1Y 4JU
Internal at all levels to reconfigure layouts and external alterations to the eastern lightwell and rear elevation and courtyard, creation of a concealed plant area at roof level within an acoustic enclosure and new dormer windows.
Development Site At Millbank Complex 21 - 30 Millbank London SW1P 4QP
Variation of Condition 1 of listed building consent dated 26 June 2016 (15/09739/LBC) for Refurbishment and replacement of facades and erection of 2 additional floors and plant enclosure to both Millbank Tower and 1 additional floor to the Y buildings; excavation of basement levels; demolition of rear car park in association with re-landscaping and reconfiguration of wider site; all in association with the use of the Tower as 207 private residential flats (Class C3) and Skybar (ancillary to adjacent Class C1), the south podium and part of tower as an arts/ cultural facility (Class D1) and the north podium and Y buildings as a 150 bedroom hotel (Class C1) with restaurant, bar and cafe at ground floor level. Use of roof of podium building as a terrace with associated alterations, NAMELY to allow changes to list of approved plans for internal and external amendments to accommodate an increase in number of hotel bedrooms from 150 to 232, complete demolition and rebuilding of the prow to allow for reconfiguation of arts/cultural facility, amendments to the residential mix/layouts in the Tower, re-configuration of basement car parking, adjustments to landscaping and associated alterations.
Broadway Complex 55 Broadway London SW1H 0BD
Internal and external alterations including extensions at 10th floor level (55 Broadway) to partially enclose the existing roof terraces, extensions at 5th, 6th and 7th floor levels of 100 Petty France, infill extensions at 3rd, 4th and 5th floors and to stair/lift turret of Wing over Station, reconfiguration of rooftop plant, reconfiguration of ground floor entrances.
111 Harley Street London W1G 6AW
Alterations at lower ground floor level to include the replacement of the existing glazed roof; insertion of new sash window; infilling of the small courtyard area for use as medical accommodation (Class E(e)); installation of plant with associated enclosure at rear ground floor level and internal alterations at lower ground floor level.