8 Cavendish Avenue London NW8 9JE
Excavation of basement with lightwells to front; Demolition and replacement of rear extension at lower ground floor level with terrace at ground floor level; Excavation to lower ground floor and rear garden; Use of garage for additional internal accommodation; Installation of plant machinery to rear; Demolition of garden house; Replacement of windows throughout (part-retrospective); Landscaping works to front and rear gardens; and associated external and internal alterations. (Linked to 23/04725/FULL)
Richmond House 79 Whitehall London SW1A 2NS
Provision of a temporary Chamber for the House of Commons and supporting facilities and infrastructure, including substantial demolition and redevelopment of Richmond House to create a part seven storey, part six storey building with a roof terrace and three levels of basement, to provide accommodation for parliamentary uses (Sui Generis). Refurbishment and internal and external alterations to 49, 50, 53 and 54 Parliament Street and 85 Whitehall, including a new bridge link, to provide a visitor entrance, visitor shop and workspaces for MPs and supporting staff (Sui Generis). Landscaping works to the forecourt of Richmond House and Richmond Terrace, and associated works including temporary construction works. (Linked to 19/08220/FULL). REVISED SCHEME: including amendments to stair tower on south elevation, reduction in lift overrun to Richmond Terrace, amendments to eastern elevation facing Curtis Green and roof plan to include additional planting RE-CONSULTATION following receipt of Addendum to originally submitted Environmental Statement (ES) and further information (EIA Reg25) including updates to ES: Ch 4 Approach to assessment, Ch 6 Townscape & Visual Impact, Ch 7 Cultural Heritage, Ch 12 Ground Conditions, Ch 13 Cumulative Impacts