29 Molyneux Street London W1H 5HW
Replacement rear lower ground floor door with of timber bi-folding doors, retention of rear garden planter and external repairs to the front hard surfacing, rear roof terrace and roof; installation of walk on glazed floor at ground floor; layout alterations; installation of doors, architraves and skirting boards and the repair of the front door; and associated works (partially retrospective). [Linked to 23/04032/FULL]
103B Lisson Grove London NW1 6UP
Rear window replacement, new flat rooflight to the roof access, pipework alterations and internal works at second floor level (part retrospective).
113 - 115 Gloucester Terrace London W2 3HB
Relocation of 2 air conditioning units from rear roof to rear third floor roof with louvred screening serving flats 5 and 6; installation of 2 additional air conditioning units at rear third floor roof to serve flat 4; internal alterations; and associated works (Linked with 21/08352/FULL). (Part retrospective)
26 Lower Belgrave Street London SW1W 0LN
Part and full replacement of doors and windows, replacement roof coverings, including access hatch, replacement of the aerial and installation of a satellite dish at roof level, installation of chimney pots / caps, replacement railings to rear terrace, installation of exterior lighting, installation of a planter box and works to the front balcony and overcladding of stone steps to entrance. Internal alterations, including relocation of kitchen to ground floor, alterations at all levels, replacement and new services, installation of lighting, replacement of internal doors, decorative finishes, fixtures and fittings and retrospective consent for opening up works.
40 Grosvenor Gardens London SW1W 0EB
Erection of extension in roof valley and lift extension at main roof level, new plant atop roof extension, replacement of areas of glazed roof in rear lightwell, formation of a ground floor level terrace and new doorway within rear lightwell. Replacement of rooflights, doors and windows to mews. Internal alterations, including installation of plant within the vaults, new areas of suspended ceiling and service risers, removal of partitions and formation of new openings in existing partitions. Retrospective consent for opening up works. (linked to 21/00188/FULL).