31 Craven Street London WC2N 5NP
Conversion of existing single-family dwelling into 4 dwellings (1x 1 bedroom flat at basement, 1x 2 bedroom flat at lower-ground floor, 1x 1 bedroom flat at ground floor level, and 1 x 4 bedroom maisonette at first to fourth floor), including new bathrooms and kitchens, and an extension at rear lower-ground and ground floor level including roof terrace at first floor level, erection of an extension at roof level and installation of new windows and doors to the rear elevation.
Basement Flat 207 Sussex Gardens London W2 2RJ
Lowering of floor level within vaults and conversion to habitable accommodation. Alterations to windows and doors. Erection of extension of rear infill to courtyard. Associated internal alterations. (Linked with 22/08369/FULL)
112 Fifth Avenue London W10 4DS
Installation of two new rooflights to rear roof slope, in association with loft conversion; erection of a rear side infill extension at ground floor level; modification of the existing window to a double door on the rear wall of the existing rear extension; installation of window to side wall of rear extension; installation of conservation roof light to roof of lean-to and installation of roof light to roof of rear extension; and installation of door to rear wall of extension; internal alterations. (Linked with 22/06936/FULL)
20 Clifton Hill London NW8 0QG
Conversion of loft space to habitable rooms and associated works; including erection of dormer window; internal staircase; associated works. (Linked with 22/05566/FULL)
17A Westbourne Terrace Road London W2 6NF
Erection of a single storey rear extension and side infill extension at basement level; conversion of the existing below pavement vaults, including new windows and doors to front lightwell. Internal alterations (Linked to 22/02742/FULL)
100 Fifth Avenue London W10 4DS
Loft conversion with associated installation of two rooflights to rear roof slope, erection of replacement rear infill extension with three new rooflights, alterations to rear fenestration, reinstatement of front boundary wall railings. Internal alterations including erection and demolition of partitions, installation of a WC under the existing staircase, removal of the chimney breast at first floor, lowering of first floor ceiling and installation of stair to loft conversion (linked to 21/02310/FULL).
100 Fifth Avenue London W10 4DS
Erection of a loft conversion with associated installation of two rooflights to rear roof slope, erection of replacement rear infill extension with three new rooflights, alterations to rear fenestration, reinstatement of front boundary wall railings. Internal alterations including erection and demolition of partitions, installation of a WC under the existing staircase, removal of a chimney breast at first floor only, lowering of first floor ceiling and installation of stair to loft conversion. (Linked with 21/04611/FULL)