Dorchester Hotel 53 Park Lane London W1K 1QA
Partial demolition of the ninth floor and erection of single storey extensions to the south, north and east (rear) of the ninth floor, erection of new kitchen extract riser, replacement windows, together with replacement plant and equipment to the roof of the ninth floor, and other associated internal and external alterations. (Linked to 22/08705/FULL)
50 York Street London W1H 1GD
Demolition and replacement of existing lower ground floor rear extension with lowered floor level and enlarged terrace above, infill of existing lower ground floor courtyard and creation of new courtyard at lower ground floor level, extend existing parapet along the first floor roof, partial infill of front lightwell, alterations to fenestration throughout including new access doors to ground floor terrace, replacement metal staircase to front lightwell, partial excavation and underpinning of lower ground floor level to lower floor level, internal alterations throughout all in connection with use of the building as a single family dwelling
60 Marlborough Place London NW8 0PL
Excavation of basement with associated lightwells and mechanical plant, demolition and replacement of existing side extension and alterations to dormers at roof level and fenestration/doors to elevations, repair and repointing of brickwork, associated works to front and rear gardens, and internal alterations including installation of lift and party wall insultation. [linked to 23/00007/NMA]
30 Gloucester Place London W1U 8PL
Alterations and extension to 30 Gloucester Place (including 91 Blandford Street and 112 George Street) including refurbishment of the lower ground, ground and first floors, extension of the lower ground floor; external works including part demolition of facades, ground floor and removal of ramp to create a new a triple arched walkway through the building with canopy, railings, security gates, new steps and ramp to provide level access to the 30 Gloucester Place entrance, a rear elevation connection with the proposed single storey retail units within the courtyard, new ramp and railings to 112 George Street entrance; façade maintenance and refurbishment; painting and repair of the rear elevation; replacement or refurbishment of windows and doors at ground and first floor; replacement railings; installation of two CCTV cameras; removal of the existing roof plant. Internal reconfigurations at basement, ground, first, second, third and roof level, including the reduction of the basement footprint, demolition of the lift machine room, demolition and relocation of the waste chute and lift, re-configuration of the office internal stair core, creation of an office lobby area, improvements to the retail arcade layout, re-configuration of the residential corridor and units at first floor. External alterations including removal of the existing BMU, introduction of a new MEP louvre, demolition of the railings on top of the lightwell, proposed MEP risers, insertion of a new brick screen at roof level to match the existing, windows to be refurbished to match the existing, new proposed windows to parts of the north and south elevation at first floor as a result of the internal reconfigurations. Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof.
31 Wilton Place London SW1X 8SH
Alterations including replacement of windows to front and rear elevations, demolition of infill extension and water closet at rear ground floor level, rationalisation of pipework to rear, replacement of front entrance tiling, reinstate rear lightwell at lower ground floor level, installation of a green wall, extension of existing WC at ground floor level, skylight at first floor level, skylight at main roof level and internal alterations on all floor levels in connection with the use as a single family dwellinghouse.
23 Montpelier Square London SW7 1JR
Demolition and replacement of the existing rear extension at lower and upper ground floor levels, removal of the first floor terrace and reinstatement of window in place of existing terrace access door. Installation of mansafe system and hatch to replacement mansard roof, replacement window at fourth floor level, replacement chimney pots, new overflow and rainwater goods, repairs to front steps and garden wall, repointing, replacement front doors at ground and lower ground levels, installation of boiler within vault, provision of CCTV, garden lighting and alterations to garden stairs.
16 Dorset Square London NW1 6QB
Demolition of the existing closet wing and rear infill extensions; Erection of rear infill extensions at lower ground and ground floor levels; erection of closet wing extension up to first floor level; use of rear flat roof at ground and first floor levels as terraces, with associated railings and alterations; alterations to windows and doors; installation of plant equipment and enclosures within rear lightwell at lower ground floor level and to rear terrace at ground floor level; alterations to lower ground floor flat. Internal alterations including the removal and addition of partitions. (Linked with 21/08859/FULL)
23 Maida Avenue London W2 1SR
Demolition of existing garage, two storey rear extension and conservatory; erection of single storey extension to side and rear with green roof; formation of window, relocation of external doors and internal alterations at lower ground and first floor (linked with 22/03586/FULL)
79 Wimpole Street London W1G 9RR
Refurbishment of the existing building, minor demolition works associated with internal and external alterations for continued medical use; creation of a new internal link at basement and ground floor level into No. 78 Wimpole Street; new chiller proposed at basement level; enlargement of existing windows to create doors onto existing terrace at first floor; single storey side extension on second floor; external plant at basement and roof level and all other associated works; installation of air conditioning units within lightwell at lower ground floor level on Welbeck Way, at roof level and two air handling units to the rear of the building on roofs at second and third floor levels; and creation of internal openings between Nos.78 and 79 at basement, ground and first floor levels.
100 Fifth Avenue London W10 4DS
Loft conversion with associated installation of two rooflights to rear roof slope, erection of replacement rear infill extension with three new rooflights, alterations to rear fenestration, reinstatement of front boundary wall railings. Internal alterations including erection and demolition of partitions, installation of a WC under the existing staircase, removal of the chimney breast at first floor, lowering of first floor ceiling and installation of stair to loft conversion (linked to 21/02310/FULL).