Purbrook House The Green Grundisburgh Suffolk IP13 6TA
Listed Building Consent - Renovation of existing former butcher's shop, including provision of floor and wall insulation, replacement of existing matchboard linings, overhaul existing sash windows and install internal secondary glazing, carry out repairs to existing gutter, including provision of secondary outlet, removal of modern ceiling and installation of new ceiling insulation and roof void ventilation, install new lead flashings to roof and parapet upstands, and carry out repairs to apparent 'dropped corner of building.
Dunningworth Stables Dock Farm Road Tunstall Suffolk IP12 2EQ
Listed Building Consent - Single storey rear extension, replacement of all windows, doors & roof lights, new out building to rear garden, new piers and woven trellis to front wall. Retail vehicular access through wall and add new gates.
The Parish Lantern The Green Walberswick IP18 6TT
Listed Building Consent - Works include demolition of single storey extension to rear of listed building and erection of replacement single storey extension with roof terrace above. Conversion of first floor and attic of listed building to single flat/maisonette. Enlargement of 2 No. dormers and insertion of 2 No. proposed rooflights to rear of listed building. Insertion of new doorset behind existing doorset to front of listed building. Reinstatement of personnel door to side of listed building. Recladding/thermal upgrading of external walls where necessary. Insertion of new window and entrance to rear of listed building. Making good hard landscaping and boundary fence. Conversion of existing outbuilding to utility area, store and customer/staff WC. Creation of new opening in existing wall to allow access from shop to tearoom.
66 High Street Southwold Suffolk IP18 6DN
Listed Building Consent - Alterations in connection with the proposed change of use for the top two floors of current retail premises to convert them into a two bedroom, two storey flat including:- new windows, doors and rooflights; new RSJ and removal of the wall between the existing office and storage space on first floor; new partitions; alterations to the rear wall/roof eaves (raising eaves by 300mm) at first floor level, to form kitchen and access to outside; new staircase and circulation system; and provision of balcony and erection of balustrading.