Kelmscott House 26 Upper Mall London W6 9TA
External alterations including refurbishment and extension of the garden pavilion building to the rear of the rear garden to provide space for a home gym and office; associated landscaping works; internal alterations including layout changes to the first floor level of the coach house to provide an additional room for use as a home office; various internal alterations to the main house including the installation of integrated joinery across all floors including to both bedrooms, the main hallway and the bathroom at third floor level, the master bedroom and guest bedroom at second floor level, and the back kitchen at ground floor level; installation of a new boiler to the cloakroom at first floor level.
The Castle Centre Broomhouse Lane London SW6 3DP
Alterations and extensions to the Grade II listed building including the demolition of the summer house, erection of a part-one, part-two and part-three storey extension and excavation of a basement beneath the extension, in connection with the use of the site as a 32-bedroom nursing home (Use Class C2) together with the demolition and replacement of front and side boundary walls, and means of access to the highway on Daisy Lane.