45 Church Lane Stibbington Peterborough PE8 6LP
Single storey rear extension to link house to garage. Change of use of garage to residential annexe and single storey rear extension of garage.
Barn The Gables High Street Ramsey
Proposed conversion of and extension to Coach House to form residential annexe, ancillary to the use of the principal dwelling.
8 - 10 Market Hill St Ives PE27 5AL
External and internal works to facilitate the change of use from Class E (offices) to Class E (restaurant)/Sui Generis (public house) to extend 'The Swan and Angel Public House', including removal of internal walls, 2 new fireplaces at ground floor. insertion of new and replacement windows/doors on the side and rear elevations and a single storey rear extension.
88 High Street Brampton Huntingdon PE28 4TH
Proposed new single-storey extension to provide space for a new Kitchen and conversion of existing outbuilding to new utility and home office space.
25 Vicarage Road Waresley Sandy SG19 3DA
Proposed rear extensions and roof lights to rear elevation. Proposed glazed link. Proposed roof light to side elevation. Removal of existing single storey side extension. New external roof light to Hallway. New and replacement drainage internally and externally to house. New boiler and flue. New linings to existing chimneys. Repair and alterations to existing fireplaces. Internal alterations to ground, first and second floors to include new bathrooms at first and second floors. Existing first floor internal bathroom walls to be altered to become one room. Replacement kitchen and dining rooms proposed in new location. Electrical wiring renewed throughout building. Existing Heating to be renewed throughout building. New replacement front and rear doors. New vertical sash windows to the ground floor and first floor rear elevation. General repair and proposals of internal and external fabric as described on the schedule of work.
10 New Street St Neots PE19 1AE
Conversion of former public house and barn to form 9 no 1 and 2 bed dwellings (C3 use) including demolition of mezzanine bathroom, two first floor rear extensions and external and internal alterations.