75-76 Blackfriars Road London Southwark SE1 8HA
Partial demolition, extension and internal and external refurbishment of Grade II listed building to improve accessibility and to change current layout to suit new hotel use works include lowering of lower ground floor, structural alterations to the existing masonry, strip out of modern partitions and services, introduction of new partitions and services. Installation of internal lift to all floors and new platform lift to front lightwell and associated fabric alterations. To the front elevation, works include: localised repairs, remodelling of front entrance, introduction of an additional step, adaptation of railings, introduction of first floor balcony, removal of existing windows and dropping of cills and introduction of new windows, installation of secondary glazing to the upper floors. Works include replacement of modern extensions with a new part 2 storey, part 5 storey rear extension and reinstatement of external courtyard, replacement of third floor windows with new timber sashes, removal and replacement of existing external pipework, localised masonry repairs. At roof level alterations to the existing roof structure to accommodate a lift overrun, smoke vent, plant and 5 new roof lights (Revised description).
158 Peckham Rye London Southwark SE22 9QH
Listed Building Consent: Retention of works following the replacement of existing conservatory with single storey rear extension; replacement of concrete tiles on existing kitchen extension with natural slate and cement corrugated covering; insertion of a roof light to existing ground floor rear extension; alteration of first floor extension to house bathroom. Refurbishment throughout including at GF: new chimeny piece, replacement electrical and mechanical services, new WC suite, new kitchen; at FF; new opening to facilitate ensuite; block up opening between front and rear room; new rear window, at SF: removal of unauthorised WC in front bedroom; blocking up of doorway between front and rear room.
34 Peckham Road London Southwark SE5 8QA
Listed Building Consent for secondary glazing, repairs to existing timber doors and windows and replacement of one window to the rear elevation. Installation of secondary glazing internally and decoration of external pebble dash to 1960s extension.
24 West Square London Southwark SE11 4SN
Alterations including amalgamation of existing studio flat back into single dwelling house; internal reconfiguration works; alterations to existing rear extension including addition of rooflights and changes to rear fenestration with formation of single large opening and new cladding; rendering of exposed brick lintel detail to first floor rear elevation, replacement of existing single glazing to windows with Mono Histoglass glazing.
27 Crosby Row London Southwark SE1 3YD
Alterations to roof including construction of new dormer windows to front and rear, repair and refurbishment of existing fenestration, erection of rear extension at first and second floor levels, refurbishment and alterations including removal of historically unsympathetic fabric to reinstate courtyard at rear. Part of ground floor level in use as office space to continue to be used as office as well as studio workspace with remainder of property being retained as single residential unit.
8 Addington Square London Southwark SE5 7JZ
Reconstruction, refurbishment and extension to 8 Addington Square, including demolition and reconstruction of entrance hall, demolition of existing ground floor rear extensions and replacement with single-storey rear extension with flat green roof, extension and part rebuilding of existing side extension with another storey and front elevation line, new railings to match No.7 Addington Square, new boundary wall at ground floor to alley, new flat roof to the bay window, replaced rear glazing, repair/replacement of rotten windows to front, re-rendering of original house facades and internal structural works.
Peckham Rye Railway Station Station Way And 1-4 Holly Grove London Southwark SE15 4RX
Listed Building Consent for partial demolition and alteration of Peckham Rye Station and formation of a new triple height concourse to the rear to provide additional circulation space, stairs and lifts and 3 storey extension onto Holly Grove provide lifts and stairs, an electrical substation and station support accommodation. Provision of an additional stair and lift on platform 1. Remodelling of the booking hall to improve station facilities and accessibility, including the creation of a new structural opening through to the new concourse building. Reinstatement of loss plasterwork and joinery in th booking hall. Reinstatement of cast iron and glazed canopy to the east elevation. Reopening of blocked up openings south elevation (booking hall) west elevation (waiting room) and installation of new timber windows, doors and associated joinery.
304 Commercial Way London Southwark SE15 1QN
Listed Building consent for the construction of a part single and part two storey rear extension and detached garden room following demolition of existing part single and part two storey rear extension and outbuilding. Replacement windows, doors, light, fenestration, gates and render.
15 Gladstone Street London Southwark SE1 6EY
Refurbishment and extension of the property. To include rear extensions at first and second floor, internal alterations at each level and an adjustment to the mansard roof and 3no. dormer windows to the front of the property and 3no. rooflights. Remodelling of the interior on all floors.
7 West Square London Southwark SE11 4SN
Listed building consent for refurbishment of listed building with internal modifications to all floors, including lowering of the lower ground floor and underpinning. Replacement of the existing fanlight with a cast iron and lead decorative fanlight to the entrance. Installation of a new door to the entrance. Replacement of windows in 1990s extension with slim line double glazing, window W3 to be replaced with a larger opening oculus window. Removal of rear dormer and construction of a new dormer in a revised location. Installation of a 2no conservation rooflights to the mansard and rear extension.