Ashbourne Methodist Church Church Street Ashbourne Derbyshire DE6 1AE
Construction of extensions, internal and external alterations to existing church, associated buildings and Chapel House including demolition, creation of community garden and associated works.
Dirks Garden Birchill Devon EX13 7LF
Construction of 2 storey rear extension, replacement of single storey link extension on North Elevation and raising of chimney. Rethatching of main house and outbuilding, internal and external alterations and repairs.
Meysey Hampton Manor School Lane Meysey Hampton Cirencester Gloucestershire GL7 5JS
Construction of link building between Coach House and Main House, internal alterations and other associated works
The Old Bakery 47 High Street Milton Under Wychwood Chipping Norton Oxfordshire OX7 6LD
Internal and external alterations to existing ancillary annexes to form a games room, home office and guest accommodation along with construction of a pergola over a widened paved terrace area. Internal works to include changes to the ground and first floor layouts and removal of part of first floor to create double height space with vaulted ceiling over and a galleried area, various remedial works and alterations to fenestration and doors. External works to include reinstating exterior to original barn appearance, erection of a new garden store and installation of wooden gates in existing driveway. (amended plans)
13 James Lind Avenue Gosport Hampshire PO12 2FB
LISTED BUILDING APPLICATION - CONSTRUCTION OF SINGLE-STOREY REAR EXTENSION FOLLOWING DEMOLITION OF EXISTING. ALTERATIONS TO INCLUDE INTERNAL LAYOUT CHANGES AT SECOND FLOOR AND ROOF LEVEL, INSTALLATION OF SOIL VENT PIPE AND INSTALLATION OF ROOF LIGHT TO FRONT ELEVATION. ENLARGEMENT, ALTERATION AND CONVERSION OF EXISTING COACH HOUSE WITH RECONSTRUCTION OF STABLE BLOCK FOR USE AS A TWO-BEDROOM ANNEXE (CONSERVATION AREA) (as amended by plans received 11.10.23)
The Bank House High Street Much Hadham Hertfordshire SG10 6BY
Repair and refurbishment of roof and chimney stacks. Refurbishment of sash windows. Demolition of outbuilding and construction of single storey extension. Removal of one sash window and surrounding section of external wall to connect extension to existing. Conversion of garden outbuilding to create office and redecoration of external walls and front door. Installation of wood burning stove and associated flue liner within the living room. Alterations to the chimney breast and mantlepiece in the kitchen. Alteration of existing ground floor WC and alterations to existing surface water drainage system adjacent to house.
Fir Tree Farmhouse 16 Main Street Cottesmore Rutland LE15 7DJ
Revised scheme for works approved under 2023/0289/LBA (Construction of a single storey extension to the rear (north west) elevation of the dwelling house and internal and external alterations), to include amendments for the materials of fenestration and type of opening. Proposed replacement of windows under previous approval on the north west elevation with alluminium sliding doors. Proposed change of windows to the south west and north east elevation from timber to alluminium. Proposed window to north west gable to be changed from timber to alluminium.
St James Hospital Locksway Road Southsea PO4 8LD
Conversion of main hospital, mortuary building and the Chapel, including external alterations - demolition of boiler house, storage wings, service room and 20th Century buildings, window and door alterations, recessed and projecting dormers, new stairs; Internal alterations to include alterations to walls, doorways and staircases. Construction of new housing; provision of parking and landscaping (Amended Scheme)
6 Chipstead Lane Riverhead Sevenoaks Kent TN13 2AG
Main house : Insulate timber suspended ground floor from below and install under floor heating. Remove faux fireplace from first floor bathroom and install shower cubicle. Combine two rear ground floor rooms with removal of internal partition. Removal of lean-to WC to rear and construction of orangery type rear extension. Raising of sill to first floor rear window and replacement timber casement with slimline double glazing. Removal of lean-to pantry addition and construction of new lobby with WC. Raising of door sill to form reduced opening for new traditional sash window. Removal of lead piping internally. Insertion of through wall extract vents to serve bathroom and kitchen. Outbuilding; Conversion to form residential annexe for use as part of the enjoyment of the single dwelling. Insertion of new timber casement windows in existing openings. Secondary glazing of existing windows. Installation of new floating screed floor to ground floor. Structural alterations to facilitate use as a residential building. Removal of ladder stair and installation of new staircase. New window opening at first floor to rear. New extension to rear with opening in rear wall.
Richmond House 79 Whitehall London SW1A 2NS
Provision of a temporary Chamber for the House of Commons and supporting facilities and infrastructure, including substantial demolition and redevelopment of Richmond House to create a part seven storey, part six storey building with a roof terrace and three levels of basement, to provide accommodation for parliamentary uses (Sui Generis). Refurbishment and internal and external alterations to 49, 50, 53 and 54 Parliament Street and 85 Whitehall, including a new bridge link, to provide a visitor entrance, visitor shop and workspaces for MPs and supporting staff (Sui Generis). Landscaping works to the forecourt of Richmond House and Richmond Terrace, and associated works including temporary construction works. (Linked to 19/08220/FULL). REVISED SCHEME: including amendments to stair tower on south elevation, reduction in lift overrun to Richmond Terrace, amendments to eastern elevation facing Curtis Green and roof plan to include additional planting RE-CONSULTATION following receipt of Addendum to originally submitted Environmental Statement (ES) and further information (EIA Reg25) including updates to ES: Ch 4 Approach to assessment, Ch 6 Townscape & Visual Impact, Ch 7 Cultural Heritage, Ch 12 Ground Conditions, Ch 13 Cumulative Impacts