Rose And Crown Inn Fosse Way Hinton St George Somerset TA17 8SX
Partial demolition of single storey rear extension, the erection of a replacement single storey rear extension, internal remodelling, replacement window, new entrance steps and external maintenance to south and east elevations.
5 Ellenborough Crescent Weston-super-Mare BS23 1XL
Listed Building Consent for change of use from vacant care home (Use Class C2) to HMO (Sui Generis) comprising 11 bedrooms and communal facilities. Demolition of 1no. rear single storey modern extension; Replacement of 2no. windows to rear elevation of house with new timber windows; erection of an extension to retained rear single storey extension, remodelling of the rear extension and rear yard; Provision of refuse storage to front and rear of property; replacement of metal gate to rear boundary and addition of lighting to rear access.
5 Ellenborough Crescent Weston-super-Mare BS23 1XL
Change of use from vacant care home (Use Class C2) to HMO (Sui Generis) comprising 13 bedrooms and communal facilities. Demolition of 1no. rear single storey modern extension; Replacement of 2no. windows to rear elevation of house with new timber windows ; erection of an extension to retained rear single storey extension, replacement of modern windows in rear extension with new UPVC windows and remodelling of the rear extension and rear yard. Provision of refuse storage to front and rear of property, replacement of metal gate to rear boundary
75-76 Blackfriars Road London Southwark SE1 8HA
Partial demolition, extension and internal and external refurbishment of Grade II listed building to improve accessibility and to change current layout to suit new hotel use works include lowering of lower ground floor, structural alterations to the existing masonry, strip out of modern partitions and services, introduction of new partitions and services. Installation of internal lift to all floors and new platform lift to front lightwell and associated fabric alterations. To the front elevation, works include: localised repairs, remodelling of front entrance, introduction of an additional step, adaptation of railings, introduction of first floor balcony, removal of existing windows and dropping of cills and introduction of new windows, installation of secondary glazing to the upper floors. Works include replacement of modern extensions with a new part 2 storey, part 5 storey rear extension and reinstatement of external courtyard, replacement of third floor windows with new timber sashes, removal and replacement of existing external pipework, localised masonry repairs. At roof level alterations to the existing roof structure to accommodate a lift overrun, smoke vent, plant and 5 new roof lights (Revised description).
Low Farm Cockfield Hall Lane Witnesham Ipswich Suffolk IP6 9JB
Listed Building Consent - Demolition of Victorian and modern east end extensions. Erection of room-in-roof extension to east end. New door link through at first floor via existing east gable window. Internal remodelling. Enlargement of north window opening.
10 Dowry Square Bristol BS8 4SH
Demolition of existing rear extension and conservatory and erection of new two storey extension. Replacement of rear ground floor window and rear staircase window and associated minor remodelling of rear facade.
The Cottage Church Street Norton St Philip Frome Somerset BA2 7LU
Erection of single-storey and two-storey rear extensions following demolition of existing single-storey rear extension. Replacement of rear dormer window with gablet window and dormer windows with two conservation rooflights and remodelling of first-floor layout.
Peckham Rye Railway Station Station Way And 1-4 Holly Grove London Southwark SE15 4RX
Listed Building Consent for partial demolition and alteration of Peckham Rye Station and formation of a new triple height concourse to the rear to provide additional circulation space, stairs and lifts and 3 storey extension onto Holly Grove provide lifts and stairs, an electrical substation and station support accommodation. Provision of an additional stair and lift on platform 1. Remodelling of the booking hall to improve station facilities and accessibility, including the creation of a new structural opening through to the new concourse building. Reinstatement of loss plasterwork and joinery in th booking hall. Reinstatement of cast iron and glazed canopy to the east elevation. Reopening of blocked up openings south elevation (booking hall) west elevation (waiting room) and installation of new timber windows, doors and associated joinery.
The Deanery 3 The Great Churchyard Bury St Edmunds Suffolk IP33 1RS
Application for listed building consent - External alterations to include; a. single storey extension to north wing to include partial demolition of rear wall and window; b. external door and window alterations to include replacement and reinstatement of window and doors to rear elevation; c. provision of gratings to basement window areas; Internal alterations involving remodelling of internal layouts to include; demolition of staircase to main entrance hall to allow for large dining area; b. partial relocation of modified staircase from main entrance hall to new stairwell within existing laundry room; c. demolition of internal partition between existing bedroom one and two; d. provision of new attic staircase; e. upgrading of thermal elements to existing attic accommodation together with provision of shower room; f. upgrading of internal doors to half hour fire resistance; g. renewal of services to include electrics, heating and plumbing together with other modifications
1-5 London Wall Buildings London Wall London EC2M 5PG
Application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended) to vary condition 7 (approved plans) of listed building consent dated 24/09/2020 (19/01346/LBC) to incorporate minor material amendments comprising: (i) reconfiguration of the existing floorplate to partially infill lightwell 05 from basement to level 08; (ii) partial infill of extension of lightwell 04 from level 02-08; (iii) relocation of plant at level 07 and 08; (iv) demolition and remodelling from the existing chimney to core 05; (v) restoration of the balustrade and reconstruction of the dormer window to the southern facade; (vi) extension of the roof terrace and creation of additional terraces at roof level and in the base of the lightwell; (vii) installation of a new treatment to lightwell 05 facade and a mansard roof system; (viii) reconfiguration of access to cycle storage and facilities, including relocation of lifts; and (ix) provision of additional amenities inclusive of cycle parking, showers, lockers and waste storage.