11 Pilgrim Street London EC4V 6RN
Submission pursuant to Conditions 4(b) Office and retail entrances at ground floor, (c) Window cleaning equipment and the garaging thereof plant, flues, fire escapes, and other excrescences at roof level, (d) Cleaning of new metal cladding, (e) Soffits, handrails, and balustrades (f) Loading bay and cycle entrance (g) External lighting, (h) External surfaces within site boundary, Condition 5 (Construction, planting, irrigation and maintenance regime of green walls/roofs and balustrades), Condition 6 (Position and size of green walls, roofs and balustrade and type of planting in contribution to biodiversity), Condition 7 (Lighting Strategy) and Condition 9 (Air quality report) of planning permission dated 29/07/2021 (app. no. 20/00870/FULL).
St Botolph Without Aldgate Aldgate High Street London EC3N 1AB
Submission of i) detailed design drawings relating to the proposed new facade(s), fenestration, entrances, brickwork, glazing, soffits, handrails, balustrades, integration of cleaning equipment, plant and external surfaces, including hard and soft landscaping; ii) details of the construction, planting irrigation and maintenance regime for the proposed green roof; iii) a landscaping scheme for all unbuilt surfaces; iv) details of fume extract arrangements, materials and construction methods, pursuant to conditions 9(b)-(l), 10, 11, 12, 14, 15 and 17 of planning permission 17/01054/FULL, dated 15.02.2018.
4 Bream's Buildings London EC4A 1HP
Submission of details: (i) Construction Logistics Plan; (ii) materials samples, ground floor elevation, windows, junctions with adjoining buildings, rooftop plant (iii) bin store; and (iv) plant commissioning report pursuant to conditions 2, 4 (a, b, c, d, e and f), 6, 9 and 10 of planning permission 20/00326/FULL dated 05 November 2020.
8 - 10 Half Moon Court London EC1A 7HE
Submission of details of the front entrance door, the creation of the bin store including the bin store opening, ventilation, doors, and louvres; all new windows and alterations to existing windows; particulars and samples of the zinc cladding to the 4th and 5th floors and the roof, details of the fourth floor dormers; the balcony and roof terrace balustrades; particulars and samples of proposed bricks and mortars for new construction and works of making good and details of the refuse storage facilities pursuant to conditions 1 (a), (b), (c), (d), (e), (f) and 2 of planning permission dated 09.07.2020 (20/00258/FULL).
68 King William Street London EC4N 7HR
Submission of samples and sample panels of all materials, details of pergola, construction details of the proposed flank elevation and details of cresting, balustrade and windows and doors of the bar structure pursuant to partial discharge of condition 5 (a), (b), (c), (e) and (g) of planning permission dated 28 January 2021 (20/00802/FULL).