100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of details for (i) a detailed site investigation to establish if the site is contaminated and to determine the potential for pollution of the water environment pursuant to condition 12; (ii) a Base-Line Terrestrial Television and Radio Interference Study to assess terrestrial television and radio reception to residential properties in the vicinity of the site pursuant to condition 14; and (iii) full details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement, that demonstrates that the development is designed to meet the relevant targets set out in the GLA Circular Economy Statement Guidance pursuant to condition 21(a) of planning permission 22/00790/FULEIA dated 24/05/2023.
Site Bounded By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane London EC3M 3JY
Submission of details of monitoring during the pre-demolition, demolition, temporary and permanent foundation works, and construction phases of the development pursuant to part (c) of condition 26 (in part) of planning permission 19/01307/FULEIA dated 23rd September 2021.
Site Bounded By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane London EC3M 3JY
Submission of details of monitoring during the pre-demolition, demolition, temporary and permanent foundation works, and construction phases of the development pursuant to part (c) of condition 6 (in part) of listed building consent 19/01283/LBC dated 23rd September 2021.
1 Selsdon Way London E14 9GL
PA/23/00952 - Tower Hamlets: Request for an Environmental Impact Assessment (EIA) Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended), in respect of a Proposed Development comprising the demolition of the existing structures on site and the construction of a new tower building of up to 38 storeys for the provision of up to 360 residential units (Class C3), 600m2 flexible community / commercial floorspace and associated works.
London Chest Hospital Bonner Road London
Consultation by the London Borough of Tower Hamlets on the request for an Environmental Impact Assessment (EIA) Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended), in respect of a Proposed Development comprising the demolition of the north wing, theatre wing, institute building, nurses accommodation and all other ancillary buildings, and refurbishment of the main hospital building, the sanitation tower, south wing, as well as construction of new buildings up to 9 storeys in height, to provide a residential-led redevelopment comprising up to 290 homes,150sqm flexible Class E floorspace, and associated works (LBTH ref. PA/23/00974)
150 Holborn London EC1N 2NS
Request by London Borough of Camden for observations on an application for 'Variation of Condition 7 (Hours of Operation) from 07.00hrs to 21.00hrs Monday-Saturday and 08.30hrs to18.00hrs Sunday to 11.30hrs to 23.30hrs Monday-Saturday and 11.30hrs to 22.30hrs Sunday of planning reference 2016/2094/P dated 25/06/18 for demolition of existing buildings and redevelopment for mixed use development up to nine storeys in height comprising 12,862 sqm GIA office floorspace (Use Class B1), 1,480 sqm GIA retail floorspace (Use Class A1-A3), 13 residential units (Use Class C3), improvements to the public realm and all other necessary enabling works' (LBC reference 2022/5485/P).
London Wall West, Bastion House And Museum of London, 140-150 London Wall, EC2
The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including the Museum of London Rotunda and Bastion House, 140 - 150 London Wall. The proposed development comprises demolition of the existing buildings and erection of three new buildings for office, culture, community and retail uses; formation of new basement areas; reconfiguration of the existing gyratory; reconfiguration of the access/egress arrangements for London Wall Car Park; removal of existing areas of the highwalk and formation of new areas of highwalk and the provision of new public realm and landscaping (ADDITIONAL INFORMATION RECEIVED).
2-3 Finsbury Avenue London EC2M 2PF
Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects during the demolition phase of development pursuant to condition 5 (in part) of planning permission 20/00869/FULEIA granted on 19.08.2021.
15 Old Bailey London EC4M 7EF
Submission of a scheme of protective works for the demolition and construction phases of development pursuant to the discharge of conditions 2 and 3 of planning permission reference 18/00124/FULL dated 27 September 2018.