Edmonton EcoPark Advent Way N18 3AG
Resource Recovery Facility: Application to Re-Discharge Requirement 4 (Detailed Design Approval) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017.
Edmonton EcoPark Advent Way N18 3AG
Northern Area Demolition: Application to Discharge Requirement 14 (Part 6) (Contaminated Land and Groundwater) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017.
Waste Deopt 4 Advent Way London N18 3AG
Resource Recovery Facility: Application to Re-Discharge Requirement 4 (Detailed Design Approval) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017.
Edmonton EcoPark Advent Way N18 3AG
Details submitted for the EcoPark House (Stage 1b, DCO works no. 2 (3), 2 (4) (a), (d), (e), (f), (h), (m) and 2 (6) (a), (d)) to Discharge Planning Requirements 4 (1)(b) (Detailed Design (Piling Risk Assessment and Piling Method Statement)) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017.
Edmonton EcoPark Advent Way N18 3AG
Details submitted for Angel and Chingford Sewer Diversion Works (Stage 1a, DCO works no. 4.a) to Discharge Planning Requirements 4 (Parts (1) a, c and d) (Detailed Design) and 14 (Parts 1, 2 and 3) (Contaminated Land and Groundwater) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017.
Edmonton EcoPark Advent Way N18 3AG
Site Wide Utilities DCO Schedule 1, paragraphs 2 (4) and (6), Application to Discharge Requirements 4 (Detailed design approval); 10 (Provision of landscaping); 12 (Access and roads); 13 (Operational surface and foul water drainage), and 14 (Contaminated Land and Groundwater) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017. | Edmonton EcoPark Advent Way N18 3AG