London Borough of Bromley Planning Applications

Found 10 planning applications

23/03488/CDETND | New Dwell - Commercial (detatched)

Greytown House 221 - 227 High Street Orpington BR6 0NZ

Construction of upward extension to provide two additional storeys to a commercial building comprising a total of 9 flats (2 two bedroom and 7 one bedroom) with associated development (APPLICATION UNDER SCHEDULE 2, PART 20, CLASS AB: NEW DWELLINGHOUSES ON TERRACED BUILDINGS IN COMMERCIAL OR MIXED USE: OF THE TOWN AND COUNTRY PLANNING (GENERAL PERMITTED DEVELOPMENT)(ENGLAND) ORDER 2015 (AS AMENDED) TO DETERMINE IF PRIOR APPROVAL IS REQUIRED FOR THE PROPOSED DEVELOPMENT WITH REGARDS TO TRANSPORT AND HIGHWAYS IMPACTS, FLOODING RISK, AIR TRAFFIC AND DEFENCE ASSETS IMPACTS, CONTAMINATION RISKS, EXTERNAL APPEARANCE OF THE BUILDING, PROVISION OF ADEQUATE NATURAL LIGHT TO PROPOSED HABITABLE ROOMS, IMPACT ON EXISTING AND NEIGHBOURING RESIDENTIAL AMENITIES, IMPACT OF COMMERCIAL NOISE ON PROPOSED RESIDENTIAL DWELLINGS, IMPACT ON THE CARRYING OUT OF TRADE, BUSINESS OR OTHER LAND USE IN THE AREA AND IMPACT ON PROTECTED VIEWS)

Local Authority
London Borough of Bromley
Type
Other (New Dwell - Commercial (detatched))
Decision
Approved (Grant Prior Approval)
Application Received
12/09/2023
Application Validated
27/09/2023
Extension Construction Development Dwelling Residential Flat
23/01413/NDFLAT | New dwelling block of flats (Prior App)

Carlton Court Maple Road Penge London SE20 8EY

Erection of a one storey roof extension to provide 3 no. flats and associated works, including new cycle store. (56 day application under Class A, Part 20, Schedule 2 to the General Permitted Development Order 2015 (as amended) with regards to transport and highways impacts, flooding risk, air traffic and defence assets impacts, contamination risks, external appearance of the building, provision of adequate natural light to habitable rooms and nationally described space standards, impact on residential amenities and protected views)

Local Authority
London Borough of Bromley
Type
Other (New dwelling block of flats (Prior App))
Decision
Approved (Grant Prior Approval)
Application Received
13/04/2023
Application Validated
13/04/2023
Extension Erection Roof Development Residential Flat
23/00021/LAORD | Consultation under Part 18 of the GPDO

Shortlands Railway Station Shortlands Road Shortlands Bromley BR2 0JA

Prior approval under Part 18 of the Town and Country Planning (General Permitted Development) Order 2015 of the design and siting of the proposed works (as approved under DC/21/05119/LAORD) comprising: Erection of three new 16-person lift shafts, one to platforms 1/2, one to platforms 3/4 and the other on the other side of platform 1/2, erection of one new stairwell on the far side of platform 1/2; and erection of one steel footbridge between the lifts to allow an amended staircase on the far side of platform 1/2 and minor extension to the footbridge length.

Local Authority
London Borough of Bromley
Type
Other (Consultation under Part 18 of the GPDO)
Decision
Approved (Grant Prior Approval)
Application Received
04/01/2023
Application Validated
04/01/2023
Extension Erection Development
22/02434/ASDWEL | Enlargment of Dwell (Additional Storey)

Lorenzo Berrys Hill Berrys Green Westerham TN16 3AG

Construction of upward extension to provide one additional storey above the existing dwellinghouse - maximum height of the proposed additional storey measures 3m internally or 3.5 externally. (Application under Schedule 2, Part 1, Class AA (enlargement of a dwellinghouse by construction of additional storeys) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) to determine if prior approval is required for the proposed development with regards to the impact on adjoining premises, the external appearance of the dwellinghouse, air traffic and defence assets and impact on protected views.)

Local Authority
London Borough of Bromley
Type
Other (Enlargment of Dwell (Additional Storey))
Decision
Approved (ASDWEL Permitted (Prior App))
Application Received
16/06/2022
Application Validated
16/06/2022
Extension Construction Development Dwelling
22/00702/AVIATN | Aviation Operational Buildings (GPDO)

Biggin Hill Airport Ltd Churchill Way Biggin Hill TN16 3BN

Consultation under Schedule 2, Part 8 Class F of the General Permitted Development Order 2015, in respect of the proposed extension to Hangar 170, to provide additional hangar space and ancillary office, as well as associated car parking to be located to the south east of the hangar in South Camp, London Biggin Hill Airport.

Local Authority
London Borough of Bromley
Type
Other (Aviation Operational Buildings (GPDO))
Decision
Approved (Decision - No Objection)
Application Received
17/02/2022
Application Validated
17/02/2022
Extension Development Office
21/05863/AVIATN | Aviation Operational Buildings (GPDO)

Biggin Hill Airport Ltd Churchill Way Biggin Hill TN16 3BN

Consultation under Schedule 2, Part 8 Class F of the General Permitted Development Order 2015, in respect of the proposed extension to Hangar 170, to provide additional hangar space and ancillary office, in South Camp, London Biggin Hill Airport.

Local Authority
London Borough of Bromley
Type
Other (Aviation Operational Buildings (GPDO))
Decision
Approved (Decision - No Objection)
Application Received
23/12/2021
Application Validated
23/12/2021
Extension Development Office
21/04452/LAORD | Consultation under Part 18 of the GPDO

Land At Southern Junction Of Station Approach And Elmstead Lane Chislehurst

Prior Approval under Part 18 of the Town and Country Planning (General Permitted Development) (Amended) Order 2015 for the Extension of a Track Paralleling Hut at Elmstead Woods Station.

Local Authority
London Borough of Bromley
Type
Other (Consultation under Part 18 of the GPDO)
Decision
Approved (Approved)
Application Received
01/10/2021
Application Validated
01/10/2021
Extension Development
21/03233/LAORD | Consultation under Part 18 of the GPDO

Petts Wood Railway Station Station Square Petts Wood Orpington BR5 1NA

Erection of lift access and connecting bridges to all three platforms including new stairs to eastern and western station entrances, extension of platforms, new brick wall to western station entrance, relocation of cycle storage and 2 new accessible parking bays. Prior approval of design and siting of the proposed works submitted by Network Rail under Part 18 of the Town and Country Planning (General Permitted Development) Order 2015.

Local Authority
London Borough of Bromley
Type
Other (Consultation under Part 18 of the GPDO)
Decision
Approved (Approved)
Application Received
21/07/2021
Application Validated
21/07/2021
Extension Erection Development
21/03970/AVIATN | Aviation Operational Buildings (GPDO)

Biggin Hill Airport Ltd Churchill Way Biggin Hill TN16 3BN

Consultation under Schedule 2, Part 8 Class F of the Town and Country Planning (General Permitted Development) Order 2015 in respect of the proposed extension to apron area at South Camp, London Biggin Hill Airport.

Local Authority
London Borough of Bromley
Type
Other (Aviation Operational Buildings (GPDO))
Decision
Approved (Decision - No Objection)
Application Received
03/09/2021
Application Validated
03/09/2021
Extension Development
21/00712/ASDWEL | Enlargment of Dwell (Additional Storey)

Greenacres Luxted Road Downe Orpington BR6 7JX

Construction of upward extension to provide one additional storey above the existing dwellinghouse - maximum height of the proposed additional storey measures 3m. (Application under Schedule 2, Part 1, Class AA (enlargement of a dwellinghouse by construction of additional storeys) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) to determine if prior approval is required for the proposed development with regards to the impact on adjoining premises, the external appearance of the dwellinghouse, air traffic and defence assets and impact on protected views.)

Local Authority
London Borough of Bromley
Type
Other (Enlargment of Dwell (Additional Storey))
Decision
Approved (ASDWEL Permitted (Prior App))
Application Received
23/02/2021
Application Validated
25/02/2021
Extension Construction Development Dwelling