Mulberry Close London NW4 1QL
Variation of condition 1 (Approved Plans), 3 (Phasing), 5 (Waste & Recycling) and 6 (Parking Layout) of planning permission reference 22/3255/S73 dated 25th October 2022 for 'Erection of 2 no. penthouse apartments to each of the 3 no. existing main blocks, demolition of existing single dwelling and erection of new single storey dwelling, remodelling of existing car park layout including relandscaping with the addition of 11 no. car parking spaces, relocation of entrance to refuse store to Sunny Gardens Road.' Variation to include revised car parking layout and associated landscaping works [Amended Description]
Site Bounded By 40 Liverpool Street, 50 Liverpool Street, Open Space From Liverpool Street (Hope Square) And Bishopsgate (Bishopsgate Square), And Sun Street Passage/Liverpool Street Bus Station At The Western Boundary London
Liverpool Street Station:Partial demolition of Station including concourse, train sheds and entrances to Bishopsgate, Liverpool Street and Sun Street Passage. Demolition of 50 Liverpool Street. Construction and remodelling of station at basement, lower and upperconcourses, new station roof, new entrances to Bishopsgate, Liverpool Street and Sun Street Passage, new lifts and escalators. Provision of units at basement, lower and upper concourse flrs for retail, café/restaurant, public house/bar. Remodelling of existing bus station and provision of a cycle hub on upper concourse. Andaz/Great Eastern Hotel:Alteration of existing building at basement, ground and upper flrs including insertion of new structure, creation of new west wall and removal and replacement of mansard roof. Change of use from hotel to office at part ground flr and across flrs 1-4; access to servicing area from vehicle lifts at flr 3; provision of units at basement and ground for retail, café/restaurant, and public house/bar; spaces for leisure and community uses; retail and café/restaurant at part of flr 5. Over Station Development:Erection of a new building above Liverpool Street Station and 40 Liverpool Street with maximum height of 108.6 metres AOD in height (excluding rooftop plant) comprising office use at flrs 5-13, and partly at flrs 14-15, with ancillary lobby and functions at flrs 3-4. New hotel at flrs 17-20 and partly within flrs 14-16, ancillary restaurant/bar at flr 15 and ancillary leisure facility at flr 16. New public amenity space at podium level comprising café/restaurant, retail, leisure; and partially at flr 16 comprising outdoor pool, leisure court and café/restaurant, alongside a publicly accessible roof garden. Provision of lifts, cycle parking, servicing, refuse, and plant.
Peckham Rye Railway Station Station Way And 1-4 Holly Grove London Southwark SE15 4RX
Partial demolition and alteration of Peckham Rye Station and formation of a new two storey concourse to the rear to provide additional circulation space, stairs and lifts. Provision of an additional stair and lift on platform 1. Remodelling of the booking hall to improve station facilities and accessibility. Demolition of 1-4 Holly Grove (Use Class F1) and redevelopment to provide a new building including lifts and stairs, an electrical substation and staff accommodation. Provision of a new station forecourt and station entrance facing west into Dovedale Court including the loss of three commercial units (Use Class E). Improvement of the pedestrian entrance on Blenheim Grove.
102 Dean Court Road Rottingdean Brighton BN2 7DJ
Remodelling of dwelling incorporating raised roof ridge height to create an additional floor with habitable rooms in the roofspace, erection of front, side and rear extensions, revised fenestration, demolition of existing garage, landscaping and widening of existing crossover.
41 Hill Brow Hove BN3 6QG
Remodelling of existing property including demolition of existing side extension, conservatory and rear terrace, roof alterations and extensions to create additional storey with flat roof, rooflights and solar panels, revised boundary treatment and fenestration, enlarged rear terrace with glazed wall and new cladding.
Low Farm Cockfield Hall Lane Witnesham Ipswich Suffolk IP6 9JB
Discharge of Condition No. 4 of DC/22/3088/LBC - Demolition of Victorian and modern east end extensions. Erection of room-in-roof extension to east end. New door link through at first floor via existing east gable window. Internal remodelling. Enlargement of north window opening - Low Farm Listed Buildings Conditions Letter, Drawing: 493 WD11 DETAILS, Roofing slate Cupa 12 datasheet and Roofing slate Cupa 12
Courtlands 2 Langley Grove New Malden KT3 3AL
Details required for Condition 5 (Fire Safety Strategy) of planning permission 22/03034/HOU (Partial demolition and remodelling of existing ground floor rear extension and rear elevation; Alterations to side elevations fenestration and alteration of side elevation bay; Alterations to ground floor front elevations porch and roof form and first floor bay; Demolition of 2no chimneys; Replacement of all existing windows; Replacement of existing roof tiles; Demolition of existing front boundary wall and fence to be replaced with raised painted render boundary wall and Cedar panel and wooden slats gate)
102 Dean Court Road Rottingdean Brighton BN2 7DJ
Remodelling of dwelling incorporating raised roof ridge height to create an additional floor with habitable rooms in the roofspace, erection of front, side and rear extensions, demolition of existing garage, landscaping and widening of existing crossover.
Wings School Whassett MILNTHORPE Cumbria LA7 7DN
Erection of 3 new external classrooms, construction of new maintenance building, alterations and extension to existing residential unit to create 2 bedrooms and additional lounge, demolition of existing maintenance building and ancillary external remodelling to create additional parking spaces, new external play area and extended grassed areas.
Winsor Primary School East Ham Manor Way Beckton London E6 5NA
The erection of an extension to an existing school building to provide new kitchen facilities including relocation of the flue at roof level, WC's and lobby entrance, refurbishment of existing accommodation to provide a new staff room and WC's and part-demolition of an existing external covered walkway, light remodelling and refurbishment to existing PPA room and staff kitchens.