566 Warwick Road Silhill Solihull Solihull B91 1AD
Removal of the existing single storey rear and side extensions. Reduction of width of garage to front.
HS2 Compounds Access From Waste Lane Balsall Common
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to submissions under Schedule 17 (6) for approvals of Lorry Routes (LR): Waste Lane Overbridge and Waste Lane East and West Road Head: Inbound Route: Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane / Waste Lane. Construction traffic will follow Waste Lane until they turn left into the site access for Waste Lane Overbridge and Waste Lane Road Head East and West. Outbound Route: Construction traffic will leave Waste Lane Overbridge and Waste Lane Road Head East and West and turn right out of the access onto Waste Lane, continuing onto Kelsey Lane before turning right onto the A452. LGVs will continue on the A452 until reaching the A45 Coventry Rd SRN. For Carol Green Rail Underbridge (South), Cromwell Lane and Beechwood Farm Accommodation Underpass the inbound and outbound routes to these sites (beyond the internal haul road) is the same as the route for Waste Lane Overbridge compound and the Roadhead location. (Re-submission of PL/2021/00471/HS2DIS)
Waste Lane, Hodgetts Lane And Truggist Lane Berkswell Solihull
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to submissions under Schedule 17 (6) for approvals of Lorry Routes (LR): Waste Lane Overbridge Satellite Compound/Waste Lane East and West Road Head Inbound Route Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane/Waste Lane. Construction traffic will follow Waste Lane until they turn left into the site access for Waste Lane Overbridge and Waste Lane Road Head East and West. Outbound Route Construction traffic will leave Waste Lane Overbridge and Waste Lane Road Head East and West and turn right out of the access onto Waste Lane, continuing onto Kelsey Lane before turning right onto the A452. LGVs will continue on the A452 until reaching the A45 Coventry Rd SRN Carol Green Rail Underbridge North Satellite Compound Inbound Route Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane / Waste Lane. Continue on Waste Lane for approximately 1.3 miles and turn left onto Hodgetts Lane and then left onto Truggist Lane, the site entrance is on the left-hand side Outbound Route Construction traffic must turn right out of site as there is a low bridge to the left. Once LGVs have turned right onto Truggist lane they will follow the above route in reverse until they have re-joined the SRN. Carol Green Rail Underbridge South Satellite Compound/Cromwell Lane Satellite Compound/Beechwood Farm Accommodation Underpass The inbound and outbound routes to these sites (beyond the internal haul road) is the same as the route for Waste Lane Overbridge compound and the Roadhead location.