Barn Approximately 70 Metres Northwest Of Reddings Farm Reddings Lane Tillingham Essex
Variation of condition 3 (Accommodation to be used by seasonal workers) on planning application 13/01060/FUL (Conversion of vacant farm buildings to form accommodation for agricultural farm workers. Alterations to Listed Building to enable conversion of farm buildings to form accommodation for agricultural farm workers. Renewal of application FUL/MAL/12/00112)
Daw Street House Daw Street Finchingfield Essex CM7 4LQ
Removal of Condition 10 of approved application 03/01645/COU granted 02.12.2003 for: Conversion of redundant traditional agricultural buildings to two holiday/short term let units. Removal of condition would allow for removal of restriction on 2No. existing buildings as holiday accommodation.
The Mulberry Bush Farm Dawes Lane Sarratt WD3 6BQ
Part Retrospective: External alterations to former agricultural buildings following the change of use to flexible commercial use (Class C1 hotel / holiday accommodation) including the insertion of rooflights, windows and doors, alterations to openings, addition of external balustrade and re-cladding of the exterior walls
HS2 Compounds Access From Waste Lane Balsall Common
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to submissions under Schedule 17 (6) for approvals of Lorry Routes (LR): Waste Lane Overbridge and Waste Lane East and West Road Head: Inbound Route: Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane / Waste Lane. Construction traffic will follow Waste Lane until they turn left into the site access for Waste Lane Overbridge and Waste Lane Road Head East and West. Outbound Route: Construction traffic will leave Waste Lane Overbridge and Waste Lane Road Head East and West and turn right out of the access onto Waste Lane, continuing onto Kelsey Lane before turning right onto the A452. LGVs will continue on the A452 until reaching the A45 Coventry Rd SRN. For Carol Green Rail Underbridge (South), Cromwell Lane and Beechwood Farm Accommodation Underpass the inbound and outbound routes to these sites (beyond the internal haul road) is the same as the route for Waste Lane Overbridge compound and the Roadhead location. (Re-submission of PL/2021/00471/HS2DIS)
Waste Lane, Hodgetts Lane And Truggist Lane Berkswell Solihull
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to submissions under Schedule 17 (6) for approvals of Lorry Routes (LR): Waste Lane Overbridge Satellite Compound/Waste Lane East and West Road Head Inbound Route Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane/Waste Lane. Construction traffic will follow Waste Lane until they turn left into the site access for Waste Lane Overbridge and Waste Lane Road Head East and West. Outbound Route Construction traffic will leave Waste Lane Overbridge and Waste Lane Road Head East and West and turn right out of the access onto Waste Lane, continuing onto Kelsey Lane before turning right onto the A452. LGVs will continue on the A452 until reaching the A45 Coventry Rd SRN Carol Green Rail Underbridge North Satellite Compound Inbound Route Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane / Waste Lane. Continue on Waste Lane for approximately 1.3 miles and turn left onto Hodgetts Lane and then left onto Truggist Lane, the site entrance is on the left-hand side Outbound Route Construction traffic must turn right out of site as there is a low bridge to the left. Once LGVs have turned right onto Truggist lane they will follow the above route in reverse until they have re-joined the SRN. Carol Green Rail Underbridge South Satellite Compound/Cromwell Lane Satellite Compound/Beechwood Farm Accommodation Underpass The inbound and outbound routes to these sites (beyond the internal haul road) is the same as the route for Waste Lane Overbridge compound and the Roadhead location.
CHERRY TREES HESKET NEWMARKET WIGTON CA7 8HZ
Change of use of agricultural land for the siting of 4 static holiday accommodation huts and 2 No. caravan pitches, change of use of stable block to shower and toilet facilities, installation of sewerage treatment plant, associated works and creation of new access track
Crestyl Barn Watercress Farm Moor Lane Sarratt Rickmansworth Hertfordshire WD3 6BZ
Prior Notification: Change of use from Agricultural Building to a flexible use to provide hotel (Class C1) holiday accommodation