28 Viking Way Corby Northamptonshire NN18 9DU
TEST two storey rear extension
10A Church Street Weldon Corby Northamptonshire NN17 3JY
Details Pursuant to condition 3 (Archaeological Programme of Works), condition 4 (Surface Water Drainage), condition 5 (Foul Water Strategy) and condition 14 (Arboricultural Impact Assessment and TPP) of Planning Permission 16/00370/DPA
Glebe Farm 10A Church Street Weldon Corby Northamptonshire NN17 3JY
Details pursuant to Condition 14 (Arboricultural Impact Assessment and Tree Protection Plan) of Planning permission 16/00370/DPA (Erection of 21 dwellinghouse including associated infrastructure and landscaping)
Glebe Farm 10A Church Street Weldon Corby Northamptonshire NN17 3JY
Details pursuant to Condition 18 (Sustainability) of Planning Permission 16/00370/DPA
10A Church Street Weldon Corby Northamptonshire NN17 3JY
Application for approval of details pursuant to discharge of Conditions 3 (Archaeology), 4 (Surface Water Drainage) and 5 (Foul Water Strategy) of planning permission 16/00370/DPA.
Roman Road Corby Northamptonshire
Installation of CCTV cameras on 6m and 8m posts with PTZ cameras and associated equipment
13A Church Street Weldon Corby Northamptonshire NN17 3JY
To replace windows to front of property, like for like, single pane. Re-wire property, re-new floor boards and fit new kitchen
16 Bardsley Road Earlstrees Industrial Estate Corby Northamptonshire NN17 4AR
Details pursuant to condition 4 (CTMP), 5B (proposed gas membrane details and specifications), 6 (Foul drainage scheme) and 7 (Surface water scheme) of planning permission 19/00335/DPA
Priors Hall Development Site Stamford Road Weldon
Details Pursuant to Discharge Condition C8b (Foundation Design) and Condition 22 (CTMP) of Planning Permission 13/00026/RVC (Priors Hall Park) specifically associated with Parcel E4 on Zone 1 of that site
Priors Hall Development Site Stamford Road Weldon Northamptonshire
Reserved matters approval of (outside of a Key Phase) of access, appearance, landscape, layout and scale, in respect of the construction of: strategic foul water sewer; foul water pumping station; surface water drainage infrastructure and spurs; substation, hard and soft landscaping; a leisure route with areas for future play; landscaped amphitheatre; temporary stockpiling of construction materials; and all ancillary works, associated infrastructure and engineering works (details in cover letter) pursuant to 19/01219/OUT (Zones 2 and 3 Priors Hall Development Site)