123 Grove Park London Southwark SE5 8LD
Details of Condition 3 - Archaeological building record Level 3 (part 2) as required by LBS application 17/AP/4124 granted 30/07/2021 (Change of use from Class D1 with an ancillary Class B1 office function to Class C3 for residential use, including conversion and part demolition of existing main house to enable the creation of 5x new residential units and the construction of 4x new residential units in the rear garden with 9x off street parking spaces, associated communal and private landscaped areas.)
George House George Street Wakefield West Yorkshire WF1 1LY
Conversion of an existing commercial office building to residential use, including all associated building works.
75-76 Blackfriars Road London Southwark
Refurbishment and extension of ground floor and lower ground floor offices including partial demolition of existing structures. Refurbishment, extension and conversion of upper floors from residential to hotel use Change of use for part of building from residential to hotel. Alterations to railings on Blackfriars Road to provide wheelchair access.
Thurrock Asian Association 35 Clarence Road Grays Essex RM17 6QJ
Conversion of an office building (Class B1(a)) into 2 self-contained residential units (C3)
33-37 New Street Aylesbury Buckinghamshire HP20 2NL
Determination as to whether prior approval (Class O) is required in respect of transport & highway impact, contamination risk, flooding and noise for the conversion of B1 offices (first floor) to form two residential units (C3).
91-93 Peckham High Street London Southwark SE15 5RS
Details of Condition 3 'CEMP' as required by planning permission ref. 16/AP/3075 (for the redevelopment comprising of the removal of the Peckham Arch and redevelopment and part conversion of the southern part of the square (including 91-93 Peckham High Street) to provide a mixed use scheme comprised of two buildings of 4 and 6 storeys to provide 19 residential (Class C3) units, 255 sqm of gallery (Class D1) space, 201 sqm of co-work (Class B1) space, and 82 sqm of office (Class B1)/retail(Class A1) space with ancillary covered cycle storage and enclosed refuse storage).
91-93 Peckham High Street London Southwark SE15 5RS
Discharge of Schedule 9, Clauses 1.1 and 1.4 - 'Management Plans: Demolition Environmental Management Plan' of the Unilateral Undertaking relating to planning permission 16/AP/3075 (Redevelopment comprising the removal of the Peckham Arch and redevelopment and part conversion of the southern part of the square (including 91-93 Peckham High Street) to provide a mixed use scheme comprised of two buildings of 4 and 6 storeys to provide 19 residential (Class C3) units, 255 sqm of gallery (Class D1) space, 201 sqm of co-work (Class B1) space, and 82 sqm of office (Class B1)/retail(Class A1) space with ancillary covered cycle storage and enclosed refuse storage)
84 High Street Rickmansworth Hertfordshire WD3 1AQ
Prior Notification: Conversion of part of ground floor, first floor and second floor from offices into two self-contained residential units
Offices 10A John Street Stroud Gloucestershire GL5 2HA
Conversion of existing two storey office accommodation to a single residential unit (HMO).
229-229a Hyde End Road Spencers Wood RG7 1BU
Application to vary condition 2 of planning consent 191299 for the Full Application for planning permission for the conversion of western part of 229 Hyde End Road from B1(a) office to C3 residential use, incorporating a single storey side extension and two-storey rear extension to create one 2-bed flat and two 1-bed flats, together with parking, cycle storage and amenity space provision. Condition 2 refers to approved detailsand the variation is to shorten the length of one single storey extension (approx 750mm) due to finding a Thames Water drainage chamber that cannot be moved.