Rosefield Solar Farm
Scoping Opinion consultation and notification by Rosefield Energyfarm Limited (the Applicant) for an Order granting Development Consent for the Rosefield Solar Farm (the Proposed Development)
Oaks Farm Milton Keynes MK17 0NF
Development of a 37MW Solar Farm, Substation, and supporting infrastructure
Land Adjacent To Grove Hill Farm Grove Hill Farm Brackley Road Turweston Buckinghamshire NN13 5JF
Proposed Development of a 14MW Solar Farm, Up to 9MW Battery Storage Facility together with all Associated Works, Equipment, and necessary Infrastructure
Dunsty Hill Farm Edgcott Road Calvert Green Buckinghamshire OX27 0BJ
Determination under Class S of Part 3 of Article 3, Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 (Amended) as to whether prior approval is required in respect of transport and highways impacts, noise impacts, contamination risks and flood risks, and whether the location or siting of the building makes it otherwise impractical or undesirable for the change of use of an existing agricultural building state funded school falling within Use Class F1 (a)
Dunsty Hill Farm Edgcott Road Calvert Green Buckinghamshire OX27 0BJ
Determination under Class S of Part 3 of Article 3, Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 (Amended) as to whether prior approval is required in respect of transport and highways impacts, noise impacts, contamination risks and flood risks, and whether the location or siting of the building makes it otherwise impractical or undesirable for the change of use of an existing agricultural building state funded school falling within Use Class F1 (a)
Land At Lower Waldridge Farm Lower Waldridge Farm Owlswick Road Ford Buckinghamshire HP17 8XW
Screening Opinion to determine whether there is a requirement for an Environmental Impact Assessment (EIA) to accompany a planning application for development at the above location for a solar farm.