Hs2 Development At Land Off Chetwode Grange Road Chetwode Buckinghamshire
In accordance with the requirements of paragraph 3 of Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval of PLANS AND SPECIFICATIONS relating to the following development authorised by the Act. Chetwode Embankment (Part of), Chetwode Cutting, Barton Hartshorn Embankment, Barton to Mixbury Cutting (Part of); Footpath CHW/18 Accommodation Overbridge; School End Overbridge; Footpath BHA/2 Overbridge; earthworks associated with the realignment of footpath CHW/18; earthworks associated with the realignment of School End; earthworks associated with the realignment of footpath BHA/2; earthworks associated with The Green realignment; earthworks associated with the Chetwode Auto Transformer Station (ATS) Compound; earthworks associated with the 3 No. Access Tracks; noise barrier; 6 No. drainage ponds; drainage ditches; watercourse diversion of a tributary of Padbury Brook; Flood Compensation Area; Barton Hartshorn Culvert (above ground elements only); location of the vehicle restraint barriers and location of the permanent (security) fencing.
South Of Wendover Extending From Rocky Lane In The South, And To The North Of Bacombe Lane At The Northern Boundary.
In accordance with the requirements of paragraph 3 of Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval of PLANS AND SPECIFICATIONS relating to the following development authorised by the Act. Small Dean Viaduct; Wendover Green Tunnel (Part of); Small Dean South Embankment (Part of); Small Dean North Embankment; Rocky Lane Underbridge; Wendover Green Tunnel South Portal Building; Small Dean Sub-Station; Earthworks associated with Wendover Auto-Transformer Station (ATS) Compound and Access (Access 6); Earthworks associated with Rocky Lane realignment and associated accesses (Accesses 1-5); Earthworks associated with the access to drainage pond 6 (Access 7); Earthworks associated with Wendover Green Tunnel South Portal Compound, Building and Access (Access 8); Earthworks associated with Bacombe Lane realignment; 11 no. drainage ponds; Drainage ditches; Rocky Lane Culvert (above ground elements only); Noise barriers; Retaining wall; Location of vehicle restraint barriers; And location of permanent (security) fencing.
The Site Extends From The Western Edge Of Aylesbury To The East Of Sedrup And Lower And Upper Hartwell As Far As Thame Valley Walk.
In accordance with the requirements of paragraph 3 of Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval of PLANS AND SPECIFICATIONS relating to the following development authorised by the Act. Aylesbury North Cutting (Part of); Oxford Road Embankment; Whaddon Hill Cutting (Part of); Footpath SBH/32 Overbridge; Earthworks associated with Footpath SBH/32 Overbridge; earthworks associated with 4 No. accesses; 3 No. drainage ponds; drainage ditches; 3 No. Culverts (above ground elements only); Hartwell Substation; noise barriers; location of vehicle restraint measures; and location of the permanent (security) fencing.
The Stables And Greenacres, Gypsy Lane, Little Billington, Leighton Buzzard, LU7 9BP
Continued use of the land for the stationing of 77 caravans (68 statics and 9 tourers) for Gypsies and Travellers, retention of two buildings for unrestricted C3 (residential) use together with the addition of a landscape buffer and associated development including drainage works, access road and fencing.
Land North And South Of Brackley Road Turweston Buckinghamshire
In accordance with the requirements of paragraph 3 of Schedule 17 to the High Speed Rail (HS2) (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval of PLANS AND SPECIFICATIONS relating to the following development authorised by the Act. Westbury Viaduct (Part of), Turweston Viaduct (Part of), Footpath WBB/17 Accommodation Overbridge, A422 Brackley Road Overbridge, Turweston Green Overbridge, Grovehill Embankment, Turweston Cutting, Turweston Embankment, earthworks associated with the realignment of the A422 Brackley Road, earthworks associated with the 5 No. access tracks, earthworks associated with the diversion of Public Right of Way WBB/17, watercourse diversion of the River Great Ouse, 2 No. Drainage Ponds, Drainage Ditches, Noise Barriers, location of the vehicle restraint barriers and location of the permanent (security) fencing.