St Francis Catholic Primary School Myers Lane Bradford West Yorkshire BD2 4ES
Construction of a single storey extension to house new main entrance, admin accommodation & second hall. A single storey extension to house a new school bin store, the demolition of an existing single storey classroom annex building and construction of new ball court comprising tarmac hard standing, line markings and 3000mm ball stop fencing. The construction of new car park and relocation of vehicular access gates and routes and various hard standing and landscaping works to form site main entrance and pedestrian access.
Land At Grid Ref 411428 430390 Highgate Road Bradford West Yorkshire
Submission of details required by condition 13 (tree protection fencing) and 15 (construction management plan) of planning permission 18/01604/MAO
Land West Of Derry Hill Menston Ilkley West Yorkshire
Submission of details required by Condition 4 (arrangements for the management of the construction site), 7 (Drainage strategy), 8 (Maintenance Plan for the surface water drainage scheme), 11 (temporary warning and direction signing arrangements), 14 (Procedure for Preventing Mud on Roads Surrounding Construction Site), 15 (details of arrangements for wheel cleaning of construction vehicles and equipment), 19 (tree protection fencing), 21 (dust management plan ), 22 (Phase 2 site investigation and risk assessment methodology), 23 (remedial options appraisal scheme), and 28 (Basal Heave Assessment)
Land At Grid Ref 404947 442128 Shann Lane Keighley West Yorkshire
Submission of details to comply with conditions 3 (phasing scheme for the construction of the dwellings), 9 (vehicular and pedestrian access), 10 (full details of the highway schemes/improvements at Shann Lane and Spring Gardens Lane), 11 ( full details of the contractor's means of access, vehicle parking facilities, loading/unloading areas for materials, location of the site compound, together with internal turning facilities, temporary warning and direction signs on the adjacent highway, levels, gradients, construction, surface treatment and means of surface water drainage shall be submitted), 12 (No phase of the development shall commence until a plan showing the position of boundary treatments for that phase has been submitted to and approved in writing by the local planning authority), 14 (Phase 2 site investigation and risk assessment), 15 (Remediation Strategy), 21 (tree protection plan showing root protection areas and location of temporary tree protective fencing) and 22 (bat tubes)of planning approval 12/04674/MAO dated 06/09/13.
Former Site Of Otto House Ingleby Road Bradford West Yorkshire BD7 2XG
Submission of details to comply with 3 (vehicular and pedestrian access), 4 (off street parking), 5 (prevention of mud on highway), 6 (wheel wash facility), 7 (construction plan), 9 (materials importation), 10 (site investigation scheme), 11 (site investigation implementation), 12 (remediation strategy), 13 (remediation verification), 14 (electrical vehicle charging points), 15 (materials), 17 (landscape management plan), 18 (biodiversity enhancements), 20 (tree protection fence), 21 (traffic regulation order), 24 (surface water drainage), 25 (surface water management), 26 (temporary drainage strategy), 27 (foul water drainage) and 28 (noise attenuation - whole site) of planning approval 19/01268/MAF
Land At Grid Ref 419031 436784 Romanby Shaw Bradford West Yorkshire
Submission of details required by condition 6 (vehicular and pedestrian access), 7 (existing vehicular access returned to footway), 8 (off street parking facility), 10 (construction plan), 11 (wheel cleaning), 14 (surface water drainage), 18 (drainage strategy), 22 (remediation verification report), 24 (methodology quality materials) and 25 (Temporary tree protective fencing) of planning approval 16/02401/MAO