Belsar Farm Meadow Road Willingham CB24 5JL
Submission of details required by conditions 3 (Materials samples), 4 (Landscaping), 6 (Tree Protection), 8 (Contamination), 9 (Foul Water Drainage), 10 (Surface Water Drainage), 13 (Site Management), 14 (Boundary Treatment), 22 (Biodiversity) and 26 (Construction Programme) of permission S/3145/16/FL
Fomer Gestamp Factory Bourn Airfield St Neots Road Bourn Cambridgeshire
Submission of details required by condition 10 (Hard Landscaping) of planning permission 20/02568/FUL: Notwithstanding the approved plans, no development above slab level shall take place until full details of hard landscape works have been submitted to and approved in writing by the Local Planning Authority. Submitted hard landscape details shall include plans, drawings and sections at an appropriate scale together with supporting text and shall include the following: a)Details of all hard landscape areas, including specifications for all proposed hard surfacing, kerbs, edges, ramps and channels, including dimensions, materials, finish, colour and typical construction. b)Details of all changes in levels and junctions between areas of different hard materials. c)Details and specification for all inspection and utilities covers set within hard surfaced areas. d)Details of all street furniture including benches, tree guards, landscape lighting, etc. e)Details of any fencing, including the proposed feature fence to the side boundary of Unit1. Reason: In the interests of the appearance of the completed scheme, as required by South Cambridgeshire Local Plan 2018 Policies HQ/1.
Plough Corner 3 High Street Little Eversden Cambridge Cambridgeshire CB23 1HE
Submission of details required by conditions 3 (Surface and Foul Water), 4 (Trees), 9 (Energy Statement), 12 (Boundary Treatment) and 15 (Construction Environmental Management Plan) of planning permission 21/00032/FUL
Land To The South Haden Way Willingham CB24 5HB
Submission of details required by conditions 6 (Tree protection), 7 (Existing Hedgerows), 8 (Contamination), 9 (Noise and dust), 10 (Phasing programme for construction), 11 (Foul water drainage), 13 (Surface water drainage), 14 (Noise Impact Assessment), 15 (Bus stops and public footways), 17 (Contractors), 19 (Waste Management Plan), 20 (Boundary Treatment), 24 (Screened storage of refuse), 25 (Covered and secure cycle parking), 27 (Provision and location of fire hydrants) and 28 (Biodiversity enhancements) of planning permission S/2456/15/OL