Waterbeach Barracks Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Discharge of condition 10.j & k (Key Phase Surface Water and Foul Water Drainage Strategy) From application S/0559/17/OL - Up to 6500 dwellings (including up to 600 residential institutional units) business retail community leisure and sports uses a hotel new primary and secondary schools green open spaces including parks ecological areas and woodlands principal new accesses from the A10 and other points of access associated infrastructure groundworks and demolition with all matters reserved except for the first primary junction from the A10 and construction access from Denny End Road.
Junction Of A1307 Babraham Road With Haverhill Road And The Access To Gog Farm Shop Heath Farm Babraham Road Stapleford Cambridge Cambridgeshire CB22 3AD
Construction of a new staggered junction, footway/cycleway: an at grade unsignalised crossing point for pedestrians and cyclists at the A1307/ Haverhill Road/ Gog Farm shop junction; a new right turn filter lane and upgraded crossing point for pedestrians and cyclists at the Gog Farm shop entrance, including associated engineering and landscape works