PL/23/0537/CONDA | Condition approval

Cedar House 58 Camp Road Gerrards Cross Buckinghamshire SL9 7PD

Approval of condition 14 (Prior to the construction of the basement level proposed to No.58, details of the method for disposal of material to be extracted to form the basement) of planning permission PL/22/3733/VRC - Variation of condition 14 (approved plans) of application PL/22/1554/VRC relating to variations of the original planning permission PL/20/3713/FA for demolition of existing two dwellings and erection of two new dwellings and garages with re-positioned vehicular access to allow for the following design changes : No56 1. Widen the first floor by 1.2m (with consequential changes to the rear elevation windows & doors). 2. Amend & extend the single storey side element to provide a link between the house & garage. 3. Alter garage to provide additional living accommodation within the roofspace. 4. Reposition the main house 0.75m further away from the northern side boundary and No54 Camp Road. No58 1. Provide a basement. 2. Enlarge the existing single storey element at the rear of the house in order to house a swimming pool. 3. Move the house 2.25m further back from the road. 4. Increase the extent of glazing to the 'Dining Room' & 'Master Bedroom 2' on the rear elevation.

Local Authority
Chiltern & South Bucks
Type
Other (Condition approval)
Decision
(Condition Accepted)
Application Validated
17/02/2023
Extension Erection Demolition Variation Amendment Construction Dwelling Windows Accommodation Garage Boundary House
PL/20/1786/ADJ | Consultation - Adjacent Authority/Area

Springfield Farm Quarry Broad Lane Beaconsfield Buckinghamshire HP9 1XD

Consultation from Buckinghamshire Council - Minerals and Waste Planning Team: Variation of conditions pursuant to planning permission CM/21/14 including amendment to the phased working, landfilling and restoration levels (conditions 3), extension of time for implementation of interim restoration scheme by five years from 2023 to 2028 and extension of time for overall completion of the site by 15 years from 2029 to 2044 (conditions 4, 91 and 92), increase in percentage of surcharging using imported waste (condition 75), removal of 250 m buffer for waste deposition (condition 15), alterations to plans including change to waste silt management system and relocation of the reception facilities, and consolidation of ecology conditions (conditions 20, 33, 34, 36, 38 and 39). (BCC Ref CM/0019/20)

Local Authority
Chiltern & South Bucks
Type
Other (Consultation - Adjacent Authority/Area)
Decision
Approved (No Objections)
Application Validated
09/06/2020