Shopping Centre Elephant And Castle And London College Of Communications London London Borough Of Southwark SE17 1LA
Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures. Additional information to describe the changes sought Amendment to condition 1 (approved plans) to secure the following changes Amendments to the office, leisure, retail, and educational floorspace areas Amendments to the residential unit mix and quantum Alterations to the residential communal amenity space Minor alterations to the building heights, elevations and positioning Alterations to pedestrian routes and walkways and associated ancillary works Deletion of conditions 25 (green roof to plot E1), 45 (Sound Insulation: Education) and 48 (External Noise Levels in Private Amenity Areas) Amendments to conditions 19 (Detailed Construction Drawings East Site) 20 (Detailed Construction Drawings Education Building) 26 (Basement Access Detailed Design) 27 (Western Viaduct Boundary) 29 (Public toilets) 31 (Landscaping Scheme) 51 (A3/A4 Opening Hours) 54 (Wind Microclimate) to amend the trigger for submitting information for conditions 19, 20, 26, 27, and 31, to change condition 29 to a compliance condition, to increase the consented opening hours under condition 51, and to amend wind speed levels for condition 54. In the Council's ..
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Deed of variation to legal agreement to permission granted on 27 March 2019 (RN 16/11376/FULL) and minor material amendment granted on 4 March 2020 (RN 19/06767/FULL) as amended on 13 October 2020 (RN 20/05397/NMA). To confirm that notwithstanding condition No 35 on the permissions not to provide more than 1946 m2 restaurant floorspace as part of the development; and that units numbered 6 and 11-17 shall be used for retail purposes only.
Development Site At St Mary's Hospital Praed Street London
Deed of Modification to the Section 106 Agreement dated 4 January 2018, associated with planning permission reference 16/11914/FULL, to amend definition of Commencement of Development under Clause 1.1 to include Drainage Infrastructure works and DIW Drawings.
50 Eastbourne Terrace London W2 6LG
Deed of Modification of Schedule One Clause 4.1 and 4.4 to the Section 106 Agreement dated 5th February 2020 associated with planning permission reference 19/07378FULL, To:- 1) Change the plans showing car parking spaces so that it aligns with non-material amendment under reference 20/02091/NMA And 2) To vary the basis on which the car parking spaces are to be managed, specifically for them to be managed on an allocated basis (one space per one residential unit).
121- 123 Lisson Grove London NW1 6UP
Variation of condition 1 of listed building consent dated 13 September 2019 (RN: 19/05339/COLBC) for Installation of internal fire alarm and internal and external emergency lighting to circulation areas to properties 121 and 123 Lisson Grove. NAMELY to amend the internal ceiling lighting.