Development Site At 161 - 237 Kensington Church Street And 39-41 And Newcombe House 45 Notting Hill Gate Royal Borough Of Kensington And Chelsea London
Partial retention, refurbishment and extension of the Newcombe House tower for continued office use (Class E(g)(i)), the full demolition of the rest of the site comprising existing retail (Class E) and housing (Class C3) uses and surface level car park, and redevelopment to provide retail use (Class E) at ground floor and office use (Class E(g)(i)) at the upper floors, housing (Class C3) and a medical Center(Class E (e), in new buildings ranging from 6-15 storeys with double basement, public realm works and other ancillary works (MAJOR DEVELOPMENT).
Development Site At 161 - 237 Kensington Church Street And 39-41 And Newcombe House 45 Notting Hill Gate Royal Borough Of Kensington And Chelsea London
Partial retention, refurbishment and extension of the Newcombe House tower for continued office use (Class E(g)(i)), the full demolition of the rest of the site comprising existing retail (Class E) and housing (Class C3) uses and surface level car park, and redevelopment to provide retail use (Class E) at ground floor and office use (Class E(g)(i)) at the upper floors, housing (Class C3) and a medical centre (Class E (e)), in new buildings ranging from 6 - 15 storeys with double basement, public realm works and other ancillary works (MAJOR DEVELOPMENT).
1 London Wall Buildings London Wall City Of London London EC2M 5PG
Request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including the Museum of London Rotunda and Bastion House, 140 - 150 London Wall. The proposed development comprises demolition of the existing buildings and erection of three new buildings for office, culture, community and retail uses; formation of new basement areas; reconfiguration of the existing gyratory; reconfiguration of the access/egress arrangements for London Wall Car Park; removal of existing areas of the highwalk and formation of new areas of highwalk and the provision of new public realm and landscaping.
100 Liverpool Street City Of London London EC2M 2RH
Request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including the Museum of London Rotunda and Bastion House, 140 - 150 London Wall. The proposed development comprises demolition of the existing buildings and erection of three new buildings for office, culture, community and retail uses; formation of new basement areas; reconfiguration of the existing gyratory; reconfiguration of the access/egress arrangements for London Wall Car Park; removal of existing areas of the highwalk and formation of new areas of highwalk and the provision of new public realm and landscaping.
Thavies Inn House 3 - 4 Holborn Circus City Of London London EC1N 2HA
Demolition of the existing building at 1-6 Holborn Circus (known as Thavies Inn House) and the erection of a ten storey Class E building for office use with Class E retail use at part ground floor level with works to include reinstatement and new pedestrian routes through the site; hard and soft landscaping works including removal and replacement trees within the public highway, and creation of pocket park in Thavies Inn; widening of the footway on St Andrew Street; and other works incidental to the proposed development.
Colechurch House 1 London Bridge Walk Southwark London SE1 2SX
Redevelopment of the site to include demolition of Colechurch House, pedestrian footbridge and walkway and erection of an elevated 22-storey building (+ 4-storey basement) above a public park and providing office floorspace, retail floorspace, restaurant/café floorspace, leisure floorspace (all Use Class E), theatre and a bar (Sui Generis), delivered alongside public realm improvements, roof gardens, cycle parking, servicing, refuse, plant areas and other associated works incidental to the development.