STREET RECORD Puddle Dock City Of London London
EIA Scoping Opinion request under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site known as Puddle Dock. The proposal involves highways works which will divide the development in three Zones (A, B and C Zones). The Zones comprise a mix of office and retail floorspace (Use Class E) up to approximately 114,160 sqm GEA and culture offer, distributed across eight blocks/buildings. The development would replace existing accommodation for the City of London School for Boys and associated rooftop MUGA and provide new public realm and roof garden/terraces.
99 Bishopsgate City Of London London EC2M 3XD
The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of the site known as 99 Bishopsgate. The proposed development comprises demolition of the existing buildings and erection of a new tower (240.5m AOD, 54 storeys excl. basement) and satellite buildings for office (Class E) (circa 97,000sq.m NIA), culture/community, retail and food and beverage uses (Class E) (circa 2000sq.m NIA); 3 basement levels, servicing access, and the provision of new public realm and landscaping and other associated works. (CoL RN 23/01122/SCOP)
Development Site At 161 - 237 Kensington Church Street And 39-41 And Newcombe House 45 Notting Hill Gate Royal Borough Of Kensington And Chelsea London
Partial retention, refurbishment and extension of the Newcombe House tower for continued office use (Class E(g)(i)), the full demolition of the rest of the site comprising existing retail (Class E) and housing (Class C3) uses and surface level car park, and redevelopment to provide retail use (Class E) at ground floor and office use (Class E(g)(i)) at the upper floors, housing (Class C3) and a medical Center(Class E (e), in new buildings ranging from 6-15 storeys with double basement, public realm works and other ancillary works (MAJOR DEVELOPMENT).
Development Site At 161 - 237 Kensington Church Street And 39-41 And Newcombe House 45 Notting Hill Gate Royal Borough Of Kensington And Chelsea London
Partial retention, refurbishment and extension of the Newcombe House tower for continued office use (Class E(g)(i)), the full demolition of the rest of the site comprising existing retail (Class E) and housing (Class C3) uses and surface level car park, and redevelopment to provide retail use (Class E) at ground floor and office use (Class E(g)(i)) at the upper floors, housing (Class C3) and a medical centre (Class E (e)), in new buildings ranging from 6 - 15 storeys with double basement, public realm works and other ancillary works (MAJOR DEVELOPMENT).
1 London Wall Buildings London Wall City Of London London EC2M 5PG
Request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including the Museum of London Rotunda and Bastion House, 140 - 150 London Wall. The proposed development comprises demolition of the existing buildings and erection of three new buildings for office, culture, community and retail uses; formation of new basement areas; reconfiguration of the existing gyratory; reconfiguration of the access/egress arrangements for London Wall Car Park; removal of existing areas of the highwalk and formation of new areas of highwalk and the provision of new public realm and landscaping.
55 Bishopsgate City Of London London EC2N 3AS
Demolition of the existing building and the erection of a part-63 storey (284.68 AOD) and part-22 storey (112.30 AOD) building plus basement, including office use (Class E); a publicly accessible multi-purpose space at ground floor level, part Level 02 and part Level 03 for a flexible use including: retail, food and beverage, drinking establishment, learning, community use, exhibition and/or performance space (Sui Generis); a public viewing gallery (Sui Generis), public realm improvements, cycle parking, servicing, vehicle lifts, refuse facilities and other works associated with the development including access and highways works. (RECONSULTATION DUE TO DESIGN AMENDMENTS AND SUBMISSION OF ADDITIONAL INFORMATION) (The proposal would provide 126,854sq.m GEA of Class E offices, lobby, plant, BMU and ancillary space; and 4,702sq.m GEA of sui generis publicly accessible space including a public viewing gallery, level 02, level 03 and LG including viewing gallery lobby; total floorspace 131,556sq.m GEA; overall height 284.68 AOD.)
150 Holborn London Borough Of Camden London EC1N 2NS
Variation of Condition 7 (Hours of Operation) from 07.00hrs to 21.00hrs Monday-Saturday and 08.30hrs to18.00hrs Sunday to 11.30hrs to 23.30hrs Monday-Saturday and 11.30hrs to 22.30hrs Sunday of planning reference 2016/2094/P dated 25/06/18 for demolition of existing buildings and redevelopment for mixed use development up to nine storeys in height comprising 12,862 sqm GIA office floorspace (Use Class B1), 1,480 sqm GIA retail floorspace (Use Class A1-A3), 13 residential units (Use Class C3), improvements to the public realm and all other necessary enabling works.
100 Liverpool Street City Of London London EC2M 2RH
Request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including the Museum of London Rotunda and Bastion House, 140 - 150 London Wall. The proposed development comprises demolition of the existing buildings and erection of three new buildings for office, culture, community and retail uses; formation of new basement areas; reconfiguration of the existing gyratory; reconfiguration of the access/egress arrangements for London Wall Car Park; removal of existing areas of the highwalk and formation of new areas of highwalk and the provision of new public realm and landscaping.
55 Bishopsgate City Of London London EC2N 3AS
Demolition of the existing building and the erection of a part-63 storey (284.68 AOD) and part-22 storey (112.30 AOD) building plus basement, including office use (Class E); a publicly accessible multi-purpose space at ground floor level, part Level 02 and part Level 03 for a flexible use including: retail, food and beverage, drinking establishment, learning, community use, exhibition and/or performance space (Sui Generis); a public viewing gallery (Sui Generis), public realm improvements, cycle parking, servicing, vehicle lifts, refuse facilities and other works associated with the development including access and highways works. (The proposal would provide 126,854 sq.m GEA of Class E offices, lobby, plant, BMU and ancillary space; and 4,702 sq.m GEA of sui generis publicly accessible space including a public viewing gallery, level 02, level 03 and LG including viewing gallery lobby; total floorspace 131,556 sq.m GEA; overall height 284.68 AOD.)
85 Gracechurch Street City Of London London
Partial demolition of existing building (Gracechurch Street frontage adapted) and the erection of a 32 storey (155.70m AOD) building plus basement levels including office use (Class E(g)(i)); flexible retail use (Class E(a), Class E(b), drinking establishments and hot food takeaway); Public Hall (sui generis); and Heritage Garden and Cultural Space at level 5 (sui generis), with cycle parking, servicing, refuse and plant areas, public realm improvements and other works associated with the development including access and highways works. (The proposal would provide 37,098sq.m GEA of Class E offices, 946sq.m GEA of Public Hall, 892sq.m of Heritage Garden and Cultural space; total floorspace 39,557sq.m GEA; overall height 155.70m AOD).