Lakes And Land South And West Of Totterdown Farm Totterdown Lane Fairford Gloucestershire
Replacement of 4 no. 11kV electricity wood pole structures. Two to the west of Totterdown Farm and two south of Horcutt Lane Industrial Estate
Overhead Powerlines Through Glebe Farm Fields Trewsbury Road Coates Gloucestershire
Remove the overhead line that crosses Glebe Farm in order to divert the current line underground so the development of orchard house can be undertaken. Construction of a new free standing H pole based transformer bound into the new undergorund voltage system
Botley Solar Farm
Proposing to build and operate a new ground mounted solar farm in Oxfordshire. The development site (the Site) has a total area of approximately 1400 hectares (ha) and is located within parts of the administrative areas of Cherwell, West Oxfordshire and The Vale of White Horse Districts
Land Parcel At E413623 N202134 Welsh Way Fairford Gloucestershire
Installation of a solar PV farm together with associated works and access arrangements
Aggregate Industries Uk Ltd Manor Farm Pit Washpool Lane Kempsford Fairford Gloucestershire GL7 4NJ
Planning application for the temporary use of an alternative agricultural access point on to Whelford Road for exiting vehicles
Warren Business Park Knockdown Wiltshire GL8 8QY
Change of use of part of existing agricultural building to B8 storage/distribution use
Land At Grid Reference 402240 210540 Rendcomb Gloucestershire
Discharge of S106 legal agreement attached to planning permission CT.6817 to enable non-agricultural use of existing barns following grant of planning permission 21/02074/FUL
Chesterton Development Phase 1A Wilkinson Road Cirencester Gloucestershire
Removal of seven sections of existing hedgerow on land at Chesterton Farm, Cirencester
Street Record Spratsgate Lane Siddington Gloucestershire
To enable the construction of a foul sewer connection from a proposed development south of Love Lane onto the Chesterton Farm sewer leading to the Cirencester Treatment Works
Land To The West Of The A429 (Crudwell Road) Malmesbury Wiltshire
EIA scoping opinion for Installation of a solar farm with a 49.9 MW output for a temporary period of 40 years, including battery storage units, associated infrastructure, permanent grid connection hub and environmental enhancements