Tesco Express 72 - 80 East Hill Dartford Kent DA1 1RZ
Submission of details relating to Noise Impact Assessment (condition 4) pursuant to planning permission DA/20/01502/FUL for conversion and extension (at second storey and to include roof terraces) of the existing building to create three flats on the first floor and two flats on the second floor, along with the retention of the two retail units on the ground floor
72 - 80 East Hill Dartford Kent DA1 1RZ
Submission of details relating to external materials (condition 3) and mechanical ventilation system (condition 5) pursuant to planning permission DA/20/01502/FUL for conversion and extension (at second storey and to include roof terraces) of the existing building to create three flats on the first floor and two flats on the second floor, along with the retention of the two retail units on the ground floor
Longfield Service Station 1 - 3 Station Road Longfield Kent DA3 7QD
Submission of details relating to contamination (condition 3) and pollution risks (condition 5) pursuant to planning permission DA/19/00160/FUL for erection of single storey extension to the north face of the existing petrol filling station shop. Existing canopy over the fuel storage tanks to be exhumed and replaced with 2No. new 60,000 litre below ground double skin steel vessels. Existing canopy over the forecourt replaced with new installed 4.5m high from the highest forecourt level. Installation of removable bollards along both existing crossings to the highway to be utilised during fuel deliveries
Major Space Unit 7 (MSU7) West Village & Service Yards 5, 8 And 12 Bluewater
Submission of details relating to bat and bird boxes in relation to MSU7 extension pursuant to condition 27 of outline planning permission DA/16/01207/OUT for extensions and alterations to the shopping centre through part demolition, alteration and refurbishment of existing buildings/ structures and erection of new buildings/structures to provide retail and related uses (Use classes A1-A5), reconfiguration of existing car and coach parking areas, reconfiguration of existing lake, open space and public realm, alteration of existing pedestrian links within the site, infrastructure and associated facilities