Land At Etherley Dene Adjacent To Etherley Lane Depot Etherley Lane Bishop Auckland DL14 6UQ
Discharge of conditions 3 (Landscaping Scheme), 5 (Foul and Surface Water Scheme), 6 (Aboricultural Method Statement), 7 (Phase 3 Remediation Strategy), and 9 (Estate Road Engineering details) pursuant to approval DM/22/00658/FPA for the erection of 7 dwellings
Land To The East Of Sea View Walk Murton SR7 9LT
Discharge of conditions 3 (construction management plan), 6 (highway engineering details), 7 (landscaping) and 12 (broadband) pursuant to planning permission DM/21/03672/FPA for the erection of 49 dwellings.
Land To South West Of 39 Salvin Street Croxdale DH6 5HZ
Discharge of Conditions 3 (Materials), 4 (Bat Box) and 5 (Landscaping scheme) of Planning Permission DM/21/00624/FPA for the erection of a dwelling
Site Of Former Gilesgate Comprehensive School Bradford Crescent Gilesgate DH1 1HN
Discharge of condition 6 (landscaping) pursuant to planning permission DM/19/02546/FPA for the erection of 60 dwellings with associated access, infrastructure and landscaping
Land To The South East Of Fieldfare Court Crookgate Bank NE16 6LW
Discharge of conditions 5 (CMP), 10 (tree protection measures) and 11 (landscape scheme) pursuant to planning permission DM/19/03094/OUT for outline planning permission for the erection of up to 60 dwellings
Land At Meadow View Wheatley Hill
Discharge of condition 3 (drainage design), 4 (landscaping plan) and 7 (landscaping maintenance management plan) of planning permission DM/19/03759/FPA for the erection of 23 dwellings
Site Of Former Gilesgate Comprehensive School Bradford Crescent Gilesgate DH1 1HN
Discharge of conditions 3 (contaminated land) and 12 (noise) pursuant to DM/19/02546/FPA for the erection of 60 dwellings with associated access, infrastructure and landscaping
Land To The North Of Middridge Road Newton Aycliffe
Discharge of conditions 5 (noise levels), 6 (drainage strategy) and 8 (site levels) pursuant to DM/17/01436/FPA for the erection of 72 no. dwellings (previously 69 so increasing unit numbers by 3) including access, landscaping and associated infrastructure (revised description 21/09/2018)