Sizewell C And Associated Development Sites Suffolk
Discharge of Requirement 2 (Code of Construction Practice - Benhall Fen Meadow: Soil Management Plan and Dust Management Plan) of Sizewell C Development Consent Order
Sizewell C And Associated Development Sites Suffolk
Discharge of Requirement 2 (Code of Construction Practice) of Sizewell C Development Consent Order, Benhall Creation of Fen Meadow - Noise Mitigation and Management Plan
Jd Power Tools Alexandra Road Lowestoft Suffolk NR32 1PL
Discharge of Condition No. 13 of DC/20/0951/FUL - The demolition of existing commercial buildings and the construction of a residential development of 31-one bedroom flats over 3/4 storeys with under croft parking and associated works - Topsoil Validation Report
Land Between High Street And Chapel Lane Woodbridge Pettistree
Discharge of Condition 24 of DC/20/3264/FUL - A phased development comprising Hybrid Planning Application: (i) Full Planning Application - Residential development of 129 dwellings (including affordable housing) together with public open space, roads, accesses, parking garages, drainage and associated infrastructure; (ii) Outline Planning Application - seven No. serviced Self Build Plots with associated access and infrastructure at Land between High Street and Chapel Lane, Pettistree, IP13 0HQ. Construction surface water management plan
Sizewell C And Associated Development Sites Suffolk
Discharge of Requirement 2 (Code of Construction Practice - Dust Management Plan and Soil Management Plan for the pre-commencement site establishment early access road) of Sizewell C Development Consent Order
71 Lowestoft Road Worlingham Beccles Suffolk NR34 7RD
Discharge of Condition No. 10 of DC/21/4482/VOC - Variation of Condition No 2 of DC/19/4254/FUL - Construction of two storey detached dwelling with integral garage and turning area - amended design - Before completion of the new access, further written and drawn (as necessary) details of the replacement frontage hedge shall be submitted to the Local Planning Authority and subsequently agreed, showing species and number of plants. The hedge shall be planted in accordance with the approved details within six months of the commencement of the development or such other period as shall be agreed in writing by the Local Planning Authority, and any plants which die during the first 5 years shall be replaced in the next planting season.
Jd Power Tools Alexandra Road Lowestoft Suffolk NR32 1PL
Discharge of Condition Nos. 9 and 18 of DC/20/0951/FUL - The demolition of existing commercial buildings and the construction of a residential development of 31-one bedroom flats over 3/4 storeys with under croft parking and associated works - 9 - flood risk asset register 18 - hard and soft landscaping
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition Nos. 3, 5, 6, 11, 12, 14, 15 and 20 of DC/21/5052/VOC. Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - Condition 3: Schedule of wall and roof materials rev B, Condition 5: Vapour Risk Assessment, Condition 6: Remediation Verification Report, Conditions 11 and 12 : Surface water disposal strategy and maintenance, Condition 14: Construction surface water management plan, Vapour risk assessment, Remediation verification report, Phase 2 contaminated land report and Phase 1 and 2 geo environmental assessment
Sizewell C And Associated Development Sites
Discharge of Requirement 2 (Code of Construction Practice MDS Noise Monitoring and Management Plan for pre commencement works, Archaeological Mitigation Dust Management Plan, Archaeological Mitigation Works Soil Management Plan) of Sizewell C Development Consent Order
Former H M Prison Blundeston Lakeside Rise Blundeston Suffolk NR32 5BE
Discharge of Condition Nos. 5, 6, 7, 9 and 10 of DC/18/4033/VOC - Variation of Condition No.2 of DC/17/2675/ARM - Approval of Reserved Matters of DC/16/2157/FUL - Hybrid planning application for demolition of prison and construction of 2no shop units with 4no flats, and 3no office units with car parking, 16no affordable housing units (full submission), and residential development including care home, roads and open space (outline submission) (Construction of 38 houses with access roads). - To provide a better layout incorporating improved car parking provision and additional space for soakaways. Replacement of drawings identified in Condition 2 of the Approval Notice for Application Reference DC/17/2675/ARM with those submitted with this application - Protection Fencing to Trees and Hedgerows, Hard Landscaping, Landscaping, Bin Storage and Highways Access Details