The Old Thatch Peasenhall Road Walpole Halesworth Suffolk IP19 9BQ
Discharge of Conditions 3, 7, 8, 9, 10, 11, 13, 14, 16, 17, 18, 19 and 20 of DC/22/4049/FUL - (Conversion of barn to dwelling including new vehicular access) - Tree Protection Plan (TPP) and Arboricultural Method Statement, Land Contamination, Vehicular Access, Electric Vehicle Charging, Cycle Storage, Bin Storage, Family Flood Plan and Water Efficiency
Grove Farm The Street Little Bealings Woodbridge Suffolk IP13 6LT
Discharge of Condition Nos. 5, 6, 7, 8 and 9 of DC/22/3733/P3Q - Prior Notification - Change of use of agricultural building to a dwelling house (Use Class C3), and for building operations reasonably necessary for the conversion - 5. - Bin Storage, 6. - Cycle storage and electric vehicle infrastructure, 7. - Site investigation, 8. - Remediation method statement (RMS), 9. - Implementation of remediation
Grove Farm The Street Little Bealings Woodbridge Suffolk IP13 6LT
Discharge of Condition Nos. 2, 6, 7, 8 and 9 of DC/23/0107/P3Q - Prior Notification - Agriculture to Dwellings - Conversion of Agricultural Barn (C) to Residential - Submission of Desk Study and Risk Assessment, and plan showing location of EV charging points and bin storage
Hall Farm Barn Gisleham Road Gisleham Lowestoft Suffolk NR33 8DX
Discharge of Conditions 3, 6, 7 & 11 of DC/20/1623/PN3 (Prior Notification - Barn conversion to 2 No. dwelling houses with associated parking).
Barn A Grove Farm The Street Little Bealings Suffolk
Discharge of Condition No. 4 of DC/22/3733/P3Q - Prior Notification - Change of use of agricultural building to a dwelling house (Use Class C3), and for building operations reasonably necessary for the conversion. - Construction Environmental Management Plan
Orchard Farm New Road Barnby Beccles Suffolk NR34 7QH
Discharge of Condition Nos. 2, 3, 4, 5 of DC/22/3559/P3Q - Prior Notification - Conversion of former farm building to full residental use (a dwelling house) - 2. Site investigation 3. Remediation method statement (RMS) submitted, 4. Implementation of Remediation, 5. Validation Report
Dennington Place Spring Lane Dennington Woodbridge Suffolk IP13 8AN
Discharge of Condition(s) 4, 6(i), 6 (ii), 6(iii), 6(iv), 6(v), 6(vi), 6(vii), 7 and 11 of Planning Permission DC/22/3905/VOC - Variation of Condition No.5 of DC/20/5084/LBC - Listed Building Consent (Alterations and refurbishment of dwelling, including new single-storey extension. Conversion of former stables building for residential annexe accommodation) - To permit the alterations to the house and the conversion of the annex to be commenced independently. Also to remove the words "building work" from the Condition in respect of the existing dwelling, since this implies that repair and maintenance work not covered by the Consent may not be put in hand.
Old Mill House Linstead Road Huntingfield Halesworth Suffolk IP19 0QP
Discharge of Condition Nos. 6,7,10,11,12 and 18 of DC/22/0891/FUL - Conversion of three redundant barns to a dwelling - Condition 6 - J2945E Old Mill House Method Statement for GCN Conditions 7 and 10- 612 14B Proposed Block Plan.pdf Conditions 11 and 12-6979-DS-DESK-PC-PD-19-10-22-V1 - Blackberry Barn.pdf Conditions 11 and 12-7070-GI-GROUND-FW-HS-17-04-23-V2-Blackberry Barn-Halesworth-phase 2.pdf Condition 18 - John Plummer Partnership - structural survey and frame assessment.pdf Condition 18 - Proposed Barn Conversion, Old Mill House, Huntingfield - Suitability for Conversion Report.pd
Orchard Farm New Road Barnby Beccles Suffolk NR34 7QH
Discharge of Condition Nos. 1 to 11 of DC/22/3559/P3Q - Prior Notification - Conversion of former farm building to full residental use (a dwelling house
Redundant Farm Buildings Wood Hall Barn Wood Hall Drive Sutton Suffolk
Discharge of Condition Nos. 4, 5, 6, 7 and 8 of DC/20/2218/FUL - Conversion of redundant farm buildings into single residential dwelling with detached workshop/home office - Condition 4 - Drawings PW1081_PL05, PL06, PL07, PL08, PL09, PL10 & PL11 Condition 5 - Drawing PW1081_PL14 and TWPro flue brochure; Condition 6 - Site Investigation Report and Condition 7 & 8 - We believe the RMS is not required, as stated in the Phase I Report