Elm Tree Farm Charsfield Road Hoo Woodbridge Suffolk IP13 7QS
Discharge of Condition No. 5 of DC/22/4706/VOC - Variation of condition 2 of application DC/21/4309/FUL - (Rear extension to the listed dwelling linking to existing outbuilding. Change of use of land to enlarge the residential curtilage to include the erection of a detached garage/cartlodge. Renovations to an existing barn on land to the north-west of the dwelling) - Materials (Dutch Barn and Garage), Eaves and Ridge Heights, Details, Fenestration Details, Method Statement for construction of the basement extension, Schedule of repairs to the farmhouse, Details of the proposed front door provided.
Land Adjoining 8 The Street Darsham Suffolk
Details as required to discharge condition 9 of DC/20/3889/VOC (Variation of Condition 2 of DC/19/1462/FUL - Erection of 26 Residential Dwellings, together with associated access, car parking and open space - Revised Four-Bedroomed Dwelling Type to that previously permitted to Plot 14; Swapping of previously permitted dwellings between Plots 18 and 25).
Barn C Former Wood Barn Cottage Site Seckford Hall Road Great Bealings Suffolk IP13 6NX
Discharge of Condition Nos 4 and 5 of DC/21/1591/VOC - Variation of Condition(s) 2 on planning permission DC/18/3970/FUL (Conversion, renovation and change of use of redundant agricultural barn to form single residential dwelling and erection of Cart Lodge, drainage and access. (resubmission with altered garaging proposal))
Development Site Adjacent Bawdsey School School Lane Bawdsey IP12 3AP
Discharge of Condition Nos. 4, 10, 14, 16 and 19 of DC/21/0318/VOC - Variation of Condition 20 of outline application DC/15/4157/OUT - Use of land for the erection of 13 new residential units, with associated vehicular access, relating to new parking and drop-off area for Bawdsey Primary School and the related Reserved Matters consent DC/19/2240/ARM - Details of all external facing and roofing materials and finishes to all external hard surface areas, details of the proposed access, means to prevent the discharge of surface water and Construction Management Plan