Public Open Space Rear Of Whitehead Close Sterling Way London N18 1BU
Environmental Impact Assessment Screening Opinion request under part 2, regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in relation to the construction of a wetlands area, involving excavation works to create wetland basins, a flood defence bund and landscaping of surrounding areas (1.6ha).
175 Willoughby Lane N17 0RX
Demolition of existing buildings on the site and redevelopment of the land to the west of Willoughby Lane / Dysons Road for the erection of modern employment premises to provide flexible employment space across use classes E (light industrial), B2 and B8 (with ancillary offices), car parking, service yard areas, landscaping and associated works.
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Upton Road And Raynham Road London N18 2LJ
Removal of the Beck House slab and associated ground works on Upton Road and construction of 134 residential dwellings (Use Class C3) and up to 188sqm flexible commercial floorspace (Use Class E) comprising buildings up to 7 storeys in height, and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide up to 70sqm community hall (Use Class F2(b)), 45sqm ancillary management office (Use Class C3), podium deck, along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels.
Meridian Water Orbital Business Park 5 Argon Road London N18 3BZ
Construction of a primary substation (Use Class Sui Generis) together with hard and soft landscaping and associated works.
Reardon Court 26 Cosgrove Close London N21 3BH
Erection of part 3, part 4 storey building to provide extra care apartments in the form of 70 flats (64x1 bed and 6x2 bed) with courtyards, communal facilities including lounge, multi-use hobby room, laundry, hairdresser / wellbeing room, mobility scooter store, library/flexible staff space together with staff room and office, and associated plant, storage, landscaping and parking.
Oakwood Park Oakwood Park Road London N14 6QB
Construction of a wetlands area involving the diversion of surface water sewers into a series of wetland basins (3500m2), retention of resultant spoil on site and landscaping of surrounding areas (2.4Ha).
Exeter Road EN3
Environmental Impact Assessment Screening Opinion Request under Part 2, Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, in relation to infill development the Exeter Road Estate for up to 129 additional residential dwellings (Use Class C3) including the refurbishment and extension of Crediton House and Ashburton House with associated means of access; car and cycle parking; hard and soft landscaping; play; public, communal and private realm; highways works; and other associated works and improvements, including works to existing parking podiums and landscape enhancement works to Durants Park.
Gas Holder Pinkham Way London N11 1QJ
Environmental Impact Assessment Screening Opinion Request under Part 2, Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in relation redevelopment of the site to provide a mixed use development including the erection of two blocks with 16 and 19 storeys in height (plus roof terraces) comprising of approximately 190 residential units, 650 sqm of commercial floorspace, 950sqm of common amenity space, as well as accessible car parking spaces, bike parking spaces for residents and bike parking spaces for the commercial area, and hard and soft landscaping.
Edmonton EcoPark Advent Way N18 3AG
Site Wide Utilities DCO Schedule 1, paragraphs 2 (4) and (6), Application to Discharge Requirements 4 (Detailed design approval); 10 (Provision of landscaping); 12 (Access and roads); 13 (Operational surface and foul water drainage), and 14 (Contaminated Land and Groundwater) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017. | Edmonton EcoPark Advent Way N18 3AG