The Cottage Church Mount Sutton-On-Hull Kingston Upon Hull HU7 4TJ
Discharge of conditions for 16/00907/FULL - 1. Erection of two storey side extension to form garage with office over (6m max length x 4.1m wide x 5.9m max height) 2. Erection of two storey side extension to form living room with bedroom over (4.5m long x 4.3m wide x 7m high) 3. Erection of gables over front dormers (5.6m max height) - conditions 3
One Stop Golf Hull Golf Centre National Avenue Kingston Upon Hull HU5 4JB
Discharge of condition 4 of approval ref. 19/01147/FULL - Two storey building to provide a sport rehabilitation centre at ground floor and 3 No. office units at first floor.
Kingston House Salvesen Way Kingston Upon Hull HU3 4XQ
Installation of roof mounted solar panels on office building and stores building (application for Prior Approval)
Hymers College Hymers Avenue Kingston Upon Hull HU3 1LW
Discharge of conditions 3, 4 and 5 of approval ref. 20/01473/FULL - Change of use of the old Caretakers Lodge from residential accommodation to office space.
Cool Solutions UK 2 Burma Drive Kingston Upon Hull HU9 5SD
Discharge of conditions for 19/00173/FULL - Erection of single storey extension to offices. - condition 3
Thos E Kettlewell And Sons Ltd 41 High Street Kingston Upon Hull HU1 1PS
Discharge of condition 3 of approval refs. 19/01373/FULL and 19/01374/LBC - 1) Change of use from offices/warehouse into 12 no. apartments 2) Installation of new windows and external doors to warehouse area of building
Land At North End Of Elba Street Kingston Upon Hull
discharge of conditions for 19/00836/FULL - Erection of workshop and ancillary offices and laying out of storage area and associated parking. - conditions 5, 6, 7 Regarding condition 7: The FFL of the Offices and Workshop are to be sited at a min 300mm above adjacent ground level and as stated on our planning submission drawings 003 & 004. The proposed 1 in 100 year flood event modelling has stated that flood levels during this event will be at 205mm above ground level which is below the FFL of the buildings. In addition the components used in the construction of the modular building are inherently flood protected i.e. the structural chassis and external wall panels are galvanised steel products, all services are via dado trunking at a level of 900mm and if any perishable material is effected by flood damage and requires replacement it can easily be replaced using stock replacements by the on site refurbishment technicians. Due to the modular nature of the building it is even possible to replace individual effected modules as and when necessary using stock modules from the applicant's manufacturing facility