Land At Worle Quarry Lower Kewstoke Road Weston-super-Mare BS22 9LF
Screening Opinion request to determine as to whether proposed development is EIA development. Development proposed is for a change of use to a use involving the processing of lithium batteries with the following operation development; installation of a new building to house part of the screener deck, hopper box and bag station; installation of associated diesel generators, as shown on the accompanying plans; installation of a number of additional non-permanent or permanent industrial storage buildings; the retention of four non-permanent industrial storage buildings; the retention of alterations and extensions made to an existing building to provide additional storage and office space; the continued siting of three shipping containers which serve as a staff locker room, staff toilets and a secure quarantine area; the retention of one portacabin and caravan which are used together for security and reception for the site; the retention of a 100,000 litre drainage water tank which serves as an overflow and temporary storage for the site drainage system; and the retention and extension of the associated palisade security fencing around the site. THIS IS NOT A PLANNING APPLICATION
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)