Bridge House Long Street Wheaton Aston Staffordshire ST19 9NF
Amendments made to the elevations of the proposed plots on the development which is detailed further in the covering letter supporting this application
SAD Site 119 Saredon Road Cheslyn Hay Staffordshire
Change of wording to condition 13 to: The development hereby permitted and the following off-site highway works should be constructed in accordance with the approved plans within 6 months of first occupation: 1. Bellmouth access on Saredon Road 2. New Controlled Pedestrian Crossing on Saredon Road 3. Removal of approximately 20m of existing echelon parking bays on Saredon Road across the proposed junction and the resentment of this area to footway. 4. Drop crossing points on View Lodge 5. Revoke any existing traffic orders affected by the scheme and amendments to existing orders
Pedestrian Footbridge Over River Stour Kinver
Amended condition 3: Within 1 month of the Phase 1 initial trial excavations as detailed in the submitted Construction and Environmental Management Plan dated 12/06/2022 Rev 01 taking place a Construction Methodology and Management Plan shall be submitted to the LPA for approval. The Plan shall include / provide for: a) the parking of vehicles of site operatives and visitors; the loading and unloading of plant and materials; the storage of plant and materials used in constructing the development; b) measures to control the emission of dust and dirt during construction; c) details of protective measures (both physical measures and sensitive working practises) to avoid impacts during construction; d) replacement planting and ecological enhancements; e) A timetable to show phasing of construction activities to avoid periods of the year when sensitive wildlife could be harmed (such as when badgers, reptiles and amphibians are active and during bird nesting seasons); f) Persons responsible for: i) Compliance with legal consents relating to nature conservation; ii) Compliance with planning conditions relating to nature conservation iii) Installation of physical protection measures during construction; iv) Regular inspection and maintenance of the physical protection measures and monitoring of working practices during construction; v) Provision of training and information about the importance of Environment Protection measures to all construction personnel on site. The development shall be carried out in accordance with the approved plan. Amended condition 4: Within 1 month of the Phase 1 initial trial excavations as detailed in the submitted Construction and Environmental Management Plan dated 12/06/2022 Rev 01 taking place, a Construction and Environmental Management Plan shall be submitted to the LPA for approval. The Plan shall include ....[remaining text as Amended Condition 3]
Croft House Croft Lane Gailey Staffordshire ST19 5PY
Application for Certificate of Appropriate Alternative Development. Land Compensation Act 1961, Section 17 as substituted by Section 63 of the Planning and Compensation Act 1991.
Hollybush Farm Bungalow Warstone Road Saredon Staffordshire WV10 7LX
The description of the development should read Change of use of horticultural shed to enclose biomass plant.
Wombourne Enterprise Park Bridgnorth Road Wombourne Staffordshire WV5 0AL
Alteration to the phasing plan to allow for commencement of industrial building to the South of the development to be undertaken whilst works continue to fully discharge Condition 10.
The Stables Old Landywood Lane Essington Staffordshire WV11 2AP
Amendment of the description of the approved development to the following: 'The use of the land for a private gypsy caravan site '
43 Rennison Drive Wombourne Staffordshire WV5 9HW
Demolition existing rear extension and development of single storey rear extension with flat roof over
Hazelbrook Industrial Estate Hazel Lane Great Wyrley Staffordshire WS6 6AA
Changes to the approved road layout design inside the development site, Unit 1 to move position slightly as a result.
The Homestead Smestow Road Smestow DUDLEY DY3 4PJ
Two-storey rear extensions and new hipped roof - 17/00117/FUL Extension of limits for beginning development with additional environmental approval, to extend the time limits of unimplemented planning permissions to 1st May 2021 subject to Environmental Approval being granted.