Central 7 The Campus Caspian Close Stanford Le Hope Essex SS17 9FN
London Gateway Logistics Park Local Development Order (LGLPLDO) Prior Notification of Development: Erection of two warehouse units (1no. Class B8 use and 1no. Class B2/B8 use) and ancillary office accommodation, plot parking, loading, unloading and turning areas, site access and circulation roads and footpaths, plant room, service infrastructure, boundary treatments, lighting, drainage, land-raising and landscaping. Construction of a single carriageway secondary infrastructure corridor, compr...
Drakes Farm Dunnings Lane Bulphan Essex RM14 3RJ
Application for the approval of details reserved by condition no.3 (Materials & Boundary Treatment) no.4 (Refuse & Recycling Facilities) no.6 (Cycle Store Provision) no.7 (FWEP) no.8 (CEMP) no9. (Surface Water Drainage) no12. (Flood Risk Assessment 2) no14. (Soft & Hard Landscaping) and no.15 (Biodiversity) of planning permission ref. 18/01443/FUL (Proposed demolition of existing commercial buildings and the re-development of the site to form 2 no. new dwellings and associated development)
Sub Station Tilbury Power Station Fort Road Tilbury Essex
Planning Inspectorate Consultation - Scoping Report for future Development Consent Order [DCO] known as East Anglia Green (ref EN020027) - Proposal: A 400 Kilovolt (kV) electricity transmission overhead line (OHL) over a distance of approximately 180 Kilometres (km) from Norwich Substation to Tilbury Substation. For Thurrock this includes 400 Kilovolt (kV) electricity transmission overhead line (OHL) corridor from Tilbury Substation to the northern Borough boundary to the west of Lower Dunton...
Oasis West 3 Atlantic Avenue Stanford Le Hope Essex SS17 9FE
London Gateway Logistics Park Local Development Order (LGLPLDO) Prior-notification of Development: Erection of a Class B8 warehouse with ancillary office accommodation. plot parking, loading, unloading and turning areas, site access and circulation roads and footpaths, plant deck, service infrastructure, gatehouse, boundary treatments, drainage, land-raising and landscaping (Plot 1040).
97 Sabina Road Chadwell St Mary Essex RM16 4PN
Application for the approval of details reserved by conditions no 3 (Materials), 5 (Landscaping), 6 (Boundary Screening), 7 (Vehicular Visibility Displays) and 8 (Parking Area Details) of planning permission ref.20/00567/FUL (Development of a 2-bedroom end of terrace dwelling house with parking provision at the rear).
West 5 North Sea Crossing Stanford Le Hope Essex SS17 9ER
London Gateway Logistics Park Local Development Order (LGLPLDO) Prior-notification of Development: Proposed erection of a Class B8 warehouse and ancillary office accommodation, plot parking, loading , unloading and turning areas, site access and circulation roads and footpaths, plant deck, service infrastructure, gatehouse, boundary treatments, drainage, land-raising and landscaping (Plot 1060).
Central 4 Baltic Avenue Stanford Le Hope Essex SS17 9FF
London Gateway Logistics Park Local Development Order (LGLPLDO) Prior-notification of Development: Erection of a Class B8 warehouse and ancillary office accommodation, plot parking, loading, unloading and turning areas, site access and circulation roads and footpaths, plant decks,service infrastructure, gatehouse, pallet store, boundary treatments, drainage, land-raising and landscaping (Plot 3040).