Land Bounded By Dinton Street, Cornbrook Road, Chester Road And Trentham Street, Manchester, M15 4FX
Article 16 consultation from Manchester City Council (131163/MO/2021) in relation to Reserved Matters Application for the approval of appearance, layout, scale and landscaping, following the approval of outline permission referenced118625/FO/2017 for the erection of a part 11, part 15 building to form a 154 bed hotel and 88 bed apart-hotel building (Use Class C1) with associated public realm, car parking, and other associated works following demolition of existing buildings
Bridgewater Canal Barton Aqueduct Barton Lane Eccles
Article 16 consultation in relation to 21/77583/LBC. Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot / cycle link across Barton Swing Bridge Aqueduct. Salford City Council, provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct, erection of new foot / cycle bridge over Barton Lane, the reinstatement of foot / cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works." Listed building consent is sought for:"The re-instatement of a canal towpath to the Barton Swing Aqueduct and associated fixings together with other supporting works."
Bridgewater Canal Barton Aqueduct Barton Lane Eccles
Article 16 consultation in relation to 21/77582/FUL. Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot / cycle link across Barton Swing Bridge Aqueduct. Salford City Council, provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct, erection of new foot / cycle bridge over Barton Lane, the reinstatement of foot / cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works." Listed building consent is sought for:"The re-instatement of a canal towpath to the Barton Swing Aqueduct and associated fixings together with other supporting works."
Land At Worrall Street Salford
Article 16 consultation from Salford Council (20/76684/FUL) in respect of demolition of existing buildings and erection of two buildings ranging from 7 to 8 storeys in height comprising 178 no. residential units together with public realm, landscaping, car parking and associated works.