Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
Queensmere Shopping Centre Wellington Street Slough
Outline application (with all matters reserved) for the demolition of buildings and the phased redevelopment of the Site to provide a mixed-use scheme comprising residential floorspace (C3 use and provision for C2 use); flexible town centre uses floor space (Use Class E and Use Class F),provision for office floorspace (Use Class E (g) (i)),supporting Sui Generis town centre uses (including a range of the following uses: pubs,wine bars,hot food takeaway),Sui Generis leisure uses (provision for a cinema or live music venue); provision for the creation of basements,car and cycle parking (including provision for a Multi-Storey Car Park); site wide landscaping,new public realm including provision of a new town square and public spaces and associated servicing,associated infrastructure,energy generation requirements and highways works [Revised Parameter Plans,Reports,Documents and Environmental Statement Amendments submitted 15th June 2022](Revised Plans and Documents have been submitted).
Land North And South Gays Lane Maidenhead
Screening Opinion from the Council under Regulation 6 (1) of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in respect of anOutline planning application with all matters reserved apart from principal points of access for the demolition of the existing agricultural buildings to create a new state-of-the-art Film and TV Studio including sound stages, ancillary offices, virtual reality studio, storage and warehouses, workshops, specialist studio facilities, and outdoor film backlot; together with the creation of a new Nature Park incorporating hard and soft landscaping, green infrastructure, sustainable drainage systems, waste storage and new cycle and pedestrian facilities; supporting infrastructure to include long-stay car parking, cycle parking, boundary treatments, sub-station, new access roundabout and vehicle route.
Heatherwood Hospital London Road Ascot SL5 8AA
Discharge of planning obligation (Change in Ownership, Clause 13) in regards to planning permission 16/03115/OUT for a hybrid planning application comprising: 1) Application for full planning permission for the development of a new Elective Care Hospital and associated Admin Hub with associated parking, vehicle access, highway works, plant and landscaping 2) Application for full planning permission for the change of use of existing building to provide GP Practice, Office, Data Centre and Staff Restaurant in association with the Elective Care Hospital 3) Application for outline planning permission (access and layout determined with all other matters reserved for future consideration) for demolition of existing hospital and redevelopment of up to 250 dwellings with associated vehicle access and highway works 4) Application for full planning permission for the change of use of existing woodland to Suitable Alternative Natural Greenspace (SANG) in association with the outline residential planning permission.
32 Peascod Street Windsor SL4 1EA
Variation (under Section 73A) of Condition 19 (Approved Plans) to substitute those plans approved under 16/02967/FULL for the partial demolition and redevelopment of existing B1 office accommodation to provide 13 dwellings comprising 5 no. town houses and 8 no. apartments including the reconfiguration of the existing second floor apartment plus associated development, landscaping and parking with amended plans.
Unit 1 And 2 And 3 Foundation Park Roxborough Way Maidenhead
Variation (under Section 73A) of Condition 13 (Approved Plans) to substitute those plans approved under 19/01661/OUT for outline application for access, landscaping, layout and scale to be considered at this stage with all other matters to be reserved for the demolition of buildings 1, 2 and 3 and the erection of three class B1 (office) buildings, new decked car park and hub building, the reconfiguration of the car parking and internal road layout and associated works with amended plans.
Queensmere Shopping Centre Wellington Street Slough
Outline application (with all matters reserved) for the demolition of buildings and the phased redevelopment of the Site to provide a mixed-use scheme comprising residential floorspace (C3 use and provision for C2 use); flexible town centre uses floor space (Use Class E and Use Class F), provision for office floorspace (Use Class E (g) (i)), supporting Sui Generis town centre uses (including a range of the following uses: pubs, wine bars, hot food takeaway), Sui Generis leisure uses (provision for a cinema or live music venue); provision for the creation of basements, car and cycle parking (including provision for a Multi-Storey Car Park); site wide landscaping, new public realm including provision of a new town square and public spaces and associated servicing, associated infrastructure, energy generation requirements and highways works.
Heatherwood Hospital London Road Ascot SL5 8AA
Discharge of planning obligation (SANG Management Plan, Schedule 6, Paragraph 1) in regards to planning applications 16/03115/OUT, 16/03824/FULL and 16/03825/FULL (hybrid application comprising: 1) application for full planning permission for the development of a new elective care hospital and associated admin hub with associated parking, vehicle access, highway works, plant and landscaping 2) application for full planning permission for the change of use of existing building to provide GP practice, office, data centre and staff restaurant in association with the elective care hospital 3) application for outline planning permission (access and layout determined with all other matters reserved for future consideration) for demolition of existing hospital and redevelopment of up to 250 dwellings with associated vehicle access and highway works 4) application for full planning permission for the change of use of existing woodland to suitable alternative natural green space (SANG) in association with the outline residential planning permission).
Bray Studios Down Place Water Oakley And Land At Water Oakley Farm Windsor Road Water Oakley Windsor
Screening Opinion from the Council under Regulation 6 (1) of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in respect of Redevelopment to create new film and TV studios, incorporating demolition, retention of 2no. existing sound stages, rehearsal building, backlot and ancillary offices on a permanent basis, construction of further new production facilities including 7 no. additional sound stages, workshops, ancillary offices and other production facilities, totalling @ 30,000 m2 of commercial floorspace, the use of Waterford House and Steading as ancillary accommodation, parking, landscaping and new vehicular access off Windsor Road.
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)