Stoke Ferry Timber Ltd Boughton Road North Stoke Ferry KINGS LYNN Norfolk PE33 9BF
DISCHARGE OF CODNITION 5 OF PLANNING PERMISSION 23/00125/CU: A change of use from an agricultural lorry park and outside storage area to a commercial outside storage area for construction materials and Items connected with Stoke Ferry Timber Ltd. Lorry parking is not applied for. (Retrospective)
Barn A Grove Farm The Street Little Bealings Suffolk
Discharge of Condition No. 4 of DC/22/3733/P3Q - Prior Notification - Change of use of agricultural building to a dwelling house (Use Class C3), and for building operations reasonably necessary for the conversion. - Construction Environmental Management Plan
Grove Farm The Street Little Bealings Woodbridge Suffolk IP13 6LT
Discharge of Condition(s) 4 of DC/23/2077/P3Q - Prior Notification - Change of use of a barn (Barn E) at Grove Farm in Little Bealings, from agricultural barn to 1no. residential dwelling - Construction Environmental Management Plan
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of (8) Landscape Plan, (10) Ecological Management Plan, (17) Code of Construction Practice, (16) Onshore Written Scheme of Investigation (18) Construction Traffic Management Plan
Land South Of Mcdonalds Restaurant Sandys Hill Lane Frome Somerset
Approval of details reserved by condition 9 - Construction and Environmental Manangement Plan (partial discharge), 10- Construction Environmental Management Plan (Biodiversity) (partial discharge), 11 - Contaminated Land Submission of Remediation, 16 - Surface Water Drainage Design Scheme (partial discharge), 17 - Tree Protection Plan (partial discharge), 22 - Estate Roads, 24 - Replacement Ecological Habitat, 25 - Ecological Landscape and Ecological Management Plan (partial discharge), 26 - Ecological Lighting Plan (partial discharge), 27 - Drainage - Foul (partial discharge) on planning consent 2019/1671/OTS (Outline planning application (all matters are reserved apart from access and the main distributor road) comprising a mixed use development at land North & South of Sandys Hill Lane, Frome, including access off Sandys Hill Lane and the demolition of existing farm buildings/farmhouse and development incorporating up to 235 dwellings, employment floorspace within Use Classes B1(a,b,c) of up to 4,050sqm (unit sizes ranging from 140sqm to 560sqm), a Drive Thru unit of up to 170sqm (Use Class A3/A5), a food retail building of approximately 1,800sqm and a non-food retail unit of approximately 1,400sqm).
North-east Corner Of Arable Field Fronting Thorpe Road (B1353), West Of Its Junction With Church Lane Aldringham Cum Thorpe Suffolk
Discharge of Condition(s) 5,8,11,12 & 16 of DC/21/4315/FUL - Erection of a general-purpose agricultural building with security fencing and ancillary rainwater harvesting tank. Construction of concrete hardstanding and new vehicular access to B1353
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
St Peters Hall Church Road South Elmham St Peter Suffolk NR35 1NQ
Discharge of Condition No.6 of DC/22/0851/FUL - Erection of a 1619sq.m General industrial (B2) building and associated external works, on a vacant area of the existing brewery site to allow the brewing process to be moved out of the existing single storey farm buildings - Construction Surface Water Management Plan
Playford Corner Works East Anglia Three Offshore Wind Farm Underground Cabling Between Bramford And Bawdsey Suffolk
Discharge requirements 22(2)(f) (artificial light emissions plan) and 23(1)(Construction Lighting Emissions Plan) for Work Numbers 39 to 40 (Playford Corner) of the East Anglia Three Offshore Wind Farm Development Consent Order
Clappits Works East Anglia Three Offshore Wind Farm Underground Cabling Between Bramford And Bawdsey Suffolk
Discharge Requirement 22(2)(d) and Requirement 24 (Construction Noise and Vibration Management Scheme) for Work Numbers 21 to 24 (Clappits) of the East Anglia Three Offshore Wind Farm Development Consent Order