Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of arm/agricultural buildings and stables, and associated works
Land To The North Of Capernwray House Hobsons Lane Capernwray Carnforth Lancashire LA6 1AE
Screening request for change of use of agricultural land to site 10 holiday lodges with associated hardstanding, erection of a reception building, relocation of access off Borran Lane, construction of a parking area and internal access roads, installation of a package treatment plant and drainage infrastructure
Land Off Mottram Old Road, Hyde, SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of farm/agricultural buildings and stables, and associated works
St Marks Recreation Ground Frant Road Royal Tunbridge Wells Kent
Adjoining Authority Consultation: Construction of a 3g artificial grass pitch; erection of a storage building; construction of a cricket pavilion; provision of 76 additional car parking spaces; change of use of agricultural land to a cricket pitch and outfield under recreational use (use class f.2(c); and retrospective erection of a decking area and pergola.
Mallardshill House And Stock Villa Stock Hill Littleton Upon Severn South Gloucestershire BS35 1NL
Removal of conditions 3 and 4 (agricultural occupancy conditions) attached to permission P89/3276. Erection of an agricultural workers dwelling. Construction of new vehicular and pedestrian access. (In accordance with the amended plans on the 18TH January 1990).
Land Between North Angle And Swaffham Prior Energy Centre Including Compound At High Town Drove, Burwell, CB25 0BP
Construction of a private underground power cable with associated electrical and communications equipment between North Angle Solar farm and Swaffham Prior Energy Centre; erection of electrical substation/switch gear buildings with associated temporary and permanent compound and parking at High Town Drove, and; installation of new transformer/switch gear at the Swaffham Prior Energy Centre with associated temporary compound; and temporary typical mobile CPEN Cable recycling layout.
Hightown Drove Burwell CB25 0BP
Construction of a private underground power cable with associated electrical and communications equipment between North Angle Solar Farm and Swaffham Prior Energy Centre; erection of electrical substation/ switch gear buildings with associated compound and parking at High Town Drove, and ; installation of new switch gear at the Swaffham Prior Energy Centre.
Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of arm/agricultural buildings and stables, and associated works.
North-east Corner Of Arable Field Fronting Thorpe Road (B1353), West Of Its Junction With Church Lane Aldringham Cum Thorpe Suffolk
Discharge of Condition(s) 5,8,11,12 & 16 of DC/21/4315/FUL - Erection of a general-purpose agricultural building with security fencing and ancillary rainwater harvesting tank. Construction of concrete hardstanding and new vehicular access to B1353
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.