Land East of Wineham Lane Wineham West Sussex BN5 9AY
Battery energy storage facility and associated infrastructure, two agricultural style barns for construction and operational storage and maintenance, site office, a transformer, operator room, perimeter walkway for members of the public and biodiversity enhancement area.
Ash View Farm Fosse Way Lydford On Fosse Somerton Somerset TA11 7DS
Application for a certificate of lawful existing use and development for access, workshop building and hardstanding area as a mixed use of the site, for the sale and hire of motor vehicles, supply and haulage of topsoil and building materials, construction, demolition, office use in association with the above businesses operating from Ash View Farm, and the use of the access for the above, in addition to the residential use associated with the dwelling known as Ash View Farm and agriculture (sui generis).
Land East of Wineham Lane Wineham West Sussex BN5 9AY
Battery energy storage facility and associated infrastructure, two agricultural style barns for construction and operational storage and maintenance, site office, a transformer, operator room, perimeter walkway for members of the public and biodiversity enhancement area.
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)