South Site Former DERA Site Chobham Lane Longcross Chertsey
Consultation on request for a Screening or Scoping Opinion for proposed development for up to 1,400 dwellings, a primary school, 3,210 sqm of commercial space (restaurants, retail, public house), 930 sqm of community space, publicly accessible open space, landscaping, ecological habitats, and access. Suitable Alternative Natural Greenspace (SANG) will be provided on site, which will link to Trumps Farm.
Land Perryfields Road Bromsgrove Worcestershire
1no. Bungalow (Array House) 1no. Shed (Array Fruit Farm) 1no. Farm Shop (Array Fruit Farm) 1no. House (Array Fruit Farm) Removal of 2no Shipping Containers
Land At And Adjacent To Hulton Park Bolton
PART A: FULL PLANNING APPLICATION FOR RESTORATION WORKS TO HULTON PARK AND EXISTING STRUCTURES & HERITAGE ASSETS WITHIN IT, INCLUDING THE PLEASURE GROUNDS, DOVECOTE, WALLED GARDEN AND LAKES, THE DEMOLITION OF VARIOUSE EXISTING BUILDINGS AND STRUCTURES; THE DEVELOPMENT OF A GOLF RESORT, INCLUDING AN 18-HOLE CHAMPIONSHIP-GRADE GOLF COURSE, CLUBHOUSE, GOLF ACADEMY (COMPROSING DRIVING RANGE, PRACTICE COURSE, ADVENTURE COURSE & ACADEMY BUILDING WITH SPORTS & LEARNING FACILITIES, A GOLF SHOP & CAFE); A HOTEL WITH ADJOINING SPA & CONFERENCE FACILITY, AND OTHER ANCILLARY BUILDINGS, STRUCTURES & ENGINEERING & LANDSCAPE WORKS INCLUDING A MAINTENANCE BUILDING, HIGHWAY ACCESSES, INTERNAL ACCESS ROADS, HIGHWAY UNDERPASS, VARIOUS BRIDGES, BOUNDARY TREATMENTS, EXTERNAL LIGHTING, PARKING, NEW AND REPLACEMENT AND OPEN SPACE; HIGHWAYS INFRASTRUCTURE; AND, WERE APPLICABLE, THE RE-ROUTING, UPGRADING AND EXTENSION OF PUBLIC RIGHTS OF WAY NETWORK AND THE CREATION OF NEW PUBLIC RIGHTS OF WAY, FOOTPATHS AND TRAILS. PART B: OUTLINE PLANNING APPLICATION FOR THE RESIDENTIAL DEVELOPMENT OF UP TO 1,036 DWELLINGS, A LOCAL CENTRE; VILLAGE HALL; COMMUNITY ALLOTMENTS; PRIMARY SCHOOL; SHOT STAY HOLIDAY ACCONNODATION, COMPRISING THE CONVERSION OF HOME FARM COTTAGE AND THE CONSTRUCTION OF MEWS BUILDING, CABINS AND LODGES; AND A RANGE OF OTHER RETAIL, LEISURE, RECREATION, COMMUNITY AND FOOD AND DRINK-RELATED USES; HIGHEAYS INFREASTRUCTURE; THE REGRADING OF LAND TO ACCOMMODATE THE GOLF COURSE AND STAGING AND SUBSEQUENT REGRADING FOR RESIDENTIAL DEVELOPMENT; AND, WHERE APPLICABLE, THE RE-ROUTING, UPGRADING AND EXTENSION OF THE PUBLIC RIGHTS OF WAY NETWORK, AND THE CREATION OF NEW PUBLIC RIGHTS OF WAY, FOOTPATHS AND TRAILS, WITH ALL MATTERS RESERVED EXCEPT FOR (IN PART) ACCESS, AND IN RESPECT OF SHORT STAY HOLIDAY ACCOMMODATION, LAYOUT
Highfields 224 London Road Great Notley Essex
Variation of Condition 2 (Approved Plans) of permission 15/00176/FUL granted 19/06/2015 for: Demolition of former farm shop, piggeries, vacant dwelling and existing recreation room and erection of 6 No. detached houses with associated new access to London Road, private access road, turning head, garages and car parking spaces, foul and surface drainage and landscaping. Variation would allow: - Variation of house types and finishes. - Changes to the access / internal road layout
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)