Lower Church Farm Speldhurst Hill Speldhurst Tunbridge Wells Kent TN3 0NJ
EIA Screening Opinion - Conversion of agricultural barn (C) into residential use with rear patio area, Retrospective conversion of part of existing barn (A) into residential use, Alterations to existing stables (B), Removal of outbuilding, New fence, Associated landscaping (refers 23/01411/FULL)
Little Acres Milley Lane Reading RG10 9TH
Full application for the proposed change of use of agricultural land to residential land incidental to Little Acres, Milley Lane Reading RG10 9TH and erection of a double garage, 2no. parking space and turning area landscaping thereon. (Retrospective)
Robins Barns Colmworth Road Little Staughton Bedfordshire MK44 2FG
Change of use of agricultural land to residential land and hard and soft landscaping (part retrospective)
Land Parcel 1 North Of Junction At Crossoak Lane And Picketts Lane Salfords Surrey
Submission of internal layout of the site and landscaping details pursuant to Condition 6 of appeal permission of 19/02276/CU. Change of use (part retrospective) of land from agricultural use for the stationing of 6 No Gypsy and Traveller pitches with associated hard and soft landscaping. As amended on 13/04/2022 and on 27/06/2022.
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)