Halfway Egg Farm Featherbed Lane Sittingbourne Kent ME9 8RA
Section 73 - Application for Minor Material Amendment to approved plans condition 34 (amendment to proposed layout) pursuant to application 18/506677/HYBRID for - Hybrid application - Planning permission is sought for change of use of existing dwellinghouse to replacement farm shop with office above, and conversion of toilet block to farm produce store (167 sqm) and Outline planning permission is sought for demolition of existing agricultural buildings and farm shop, erection of up to 19 dwellings, erection of implement store, associated access road, parking, pedestrian footpath and landscaping (access and layout being sought only).
Hare Hatch Sheeplands London Road Twyford RG10 9HW
Full application for the proposed redevelopment of existing mixed use site to a new garden centre with associated play area, allotments, reconfigured parking and servicing, landscaping and other associated infrastructure, replacement caf�, demolition of existing glasshouses, and retention of existing farm shop, site office/toilet block.
Rectory Farm Kings Langley Hertfordshire
Comprehensive development comprising 135 residential units, new community buildings (including cafe and farm shop, cycle hub, repair shed, meeting and office space) creation of new public open space and play space, provision of new vehicular and pedestrian access from Hempstead Road, provision of cycle and car parking and associated works - Dacorum Borough Council application reference 22/01836/MFA
Battleaxes Inn Bristol Road Wraxall BS48 1LQ
Screening Opinion as to whether Environmental Impact Assessment (EIA) is required for a proposed development to create a new mix of uses including community hub, farm shop, café, studio spaces and artisans studios together with retention of the overnight accommodation offer. Erection of 7no. new build low carbon homes and a state of the art Head Quarters office for Studio Hive in the grounds of the property. THIS IS NOT A PLANNING APPLICATION
Agricultural Land Leicester Road Lutterworth Leicestershire
Screening Opinion request in accordance with Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, in order to determine whether the production of an Environmental Statement is required to accompany an outline/hybrid planning application for the development of the following: Approximately 14 hectares of land for a solar farm; Approximately 6.4 hectares of land for industrial/commercial land (labelled green industry and office park on the attached plan); An electric vehicle (EV) charging facility for 20 vehicles: A farm shop/café of approximately 500 square metres floorspace; and The use of land for the siting of 21 residential lodges and an ancillary maintenance/management building
Halfway Egg Farm Featherbed Lane Sittingbourne Kent ME9 8RA
Hybrid application - Planning permission is sought for change of use of existing dwellinghouse to replacement farm shop with office above, and conversion of toilet block to farm produce store (167 sqm) and Outline planning permission is sought for demolition of existing agricultural buildings and farm shop, erection of up to 19 dwellings, erection of implement store, associated access road, parking, pedestrian footpath and landscaping (access and layout being sought only).
The Main Farm Office Intwood Farm Intwood Road Intwood Norfolk NR4 6TQ
Change of internal use from farm office to farm shop with no external alterations or amendments.
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)